Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | 15.00 Mt | 0.80% | 0.12 Mt Cu | 30 Apr 2025 |
| Probable | 13.30 Mt | 0.70% | 0.09 Mt Cu | 30 Apr 2025 |
| Total Reserves | 28.30 Mt | 0.70% | 0.21 Mt Cu | 30 Apr 2025 |
| Category | Tonnes (Mt) | Cu | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | |||||
| Proved | 15.00 Mt | 0.80% | 0.12 Mt Cu | 30 Apr 2025 | Table 1: The April 2025 BKM Ore Reserve EstimateUnverified | |
notes (2)Ref: Table 1: The April 2025 BKM Ore Reserve Estimate
QA notes:
|
| Probable | 13.30 Mt | 0.70% | 0.09 Mt Cu | 30 Apr 2025 | Table 1: The April 2025 BKM Ore Reserve EstimateUnverified | notes (2)Ref: Table 1: The April 2025 BKM Ore Reserve Estimate
QA notes:
|
| Total Reserves | 28.30 Mt | 0.70% | 0.21 Mt Cu | 30 Apr 2025 | Table 1: The April 2025 BKM Ore Reserve EstimateUnverified | notes (2)Ref: Table 1: The April 2025 BKM Ore Reserve Estimate
QA notes:
|