These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | 59.82 Mt | 0.45% Li2O | 0.67 Mt LCE | 30 Sept 2025 |
| Indicated | 378.23 Mt | 0.41% Li2O | 3.87 Mt LCE | 30 Sept 2025 |
| Inferred | 309.49 Mt | 0.39% Li2O | 2.91 Mt LCE | 30 Sept 2025 |
| Total Resources | 693.14 Mt | 0.43% Li2O | 7.31 Mt LCE | 30 Sept 2025 |
| Proved | 14.50 Mt | 0.60% Li2O | 0.04 Mt LCE | 31 Dec 2025 |
| Probable | 39.90 Mt | 0.56% Li2O | 0.10 Mt LCE | 31 Dec 2025 |
| Total Reserves | 54.40 Mt | 0.58% Li2O | 0.15 Mt LCE | 31 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | |||||
| Measured | 59.82 Mt | 0.45% Li2O | 0.67 Mt LCE | 30 Sept 2025 | page 50Unverified | |
notes (6)Ref: page 50
QA notes:
|
| Indicated | 378.23 Mt | 0.41% Li2O | 3.87 Mt LCE | 30 Sept 2025 | page 50Unverified | notes (6)Ref: page 50
QA notes:
|
| Inferred | 309.49 Mt | 0.39% Li2O | 2.91 Mt LCE | 30 Sept 2025 | page 50Unverified | notes (6)Ref: page 50
QA notes:
|
| Total Resources | 693.14 Mt | 0.43% Li2O | 7.31 Mt LCE | 30 Sept 2025 | Unverified | — |
| Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | |||||
| Proved | 14.50 Mt | 0.60% Li2O | 0.04 Mt LCE | 31 Dec 2025 | page 50Unverified | notes (5)Ref: page 50
QA notes:
|
| Probable | 39.90 Mt | 0.56% Li2O | 0.10 Mt LCE | 31 Dec 2025 | page 50Unverified | notes (5) |
| Total Reserves | 54.40 Mt | 0.58% Li2O | 0.15 Mt LCE | 31 Dec 2025 | page 50Unverified | notes (5) |
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; EUROPEAN METALS HOLDINGS LIMITED ORD NPV (DI) holds 49.0% of this project.