Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 5.00 Mt | 0.47 g/t | 0.08 Moz | 11 Dec 2025 |
| Inferred | 5.40 Mt | 0.28 g/t | 0.05 Moz | 11 Dec 2025 |
| Total Resources | 10.40 Mt | 0.37 g/t | 0.12 Moz | 11 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 5.00 Mt | 52.60 g/t | 8.46 Moz | 11 Dec 2025 |
| Inferred | 5.40 Mt | 48.52 g/t | 8.42 Moz | 11 Dec 2025 |
| Total Resources | 10.30 Mt | 51.00 g/t | 16.89 Moz | 11 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 5.00 Mt | 0.99% | 0.05 Mt Zn | 11 Dec 2025 |
| Inferred | 5.40 Mt | 0.40% | 0.02 Mt Zn | 11 Dec 2025 |
| Total Resources | 10.40 Mt | 0.69% | 0.07 Mt Zn | 11 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Pb) | Contained (Mt Pb) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 5.00 Mt | 0.81% | 0.04 Mt Pb | 11 Dec 2025 |
| Inferred | 5.40 Mt | 0.27% | 0.01 Mt Pb | 11 Dec 2025 |
| Total Resources | 10.40 Mt | 0.53% | 0.06 Mt Pb | 11 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | Zn | Pb | As at | Source | Provenance | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | ||||||
| Total | Total Resources | 10.30–10.40 Mt | |||||||||||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| 0.37 g/t | 0.12 Moz |
| 51.00 g/t | 16.89 Moz |
| 0.69% | 0.07 Mt Zn |
| 0.53% | 0.06 Mt Pb |
| 11 Dec 2025 |
| 4Unverified |
notes (3)Ref: 4
|
| Open pit | Indicated | 4.70 Mt | 0.48 g/t | 0.07 Moz | 52.00 g/t | 7.86 Moz | 1.00% | 0.05 Mt Zn | 0.83% | 0.04 Mt Pb | 11 Dec 2025 | 4Unverified | notes (5)Ref: 4
QA notes:
|
| Open pit | Inferred | 3.20 Mt | 0.26 g/t | 0.03 Moz | 31.00 g/t | 3.19 Moz | 0.40% | 0.01 Mt Zn | 0.26% | 0.01 Mt Pb | 11 Dec 2025 | 4Unverified | notes (3)Ref: 4
|
| Underground | Indicated | 0.30 Mt | 0.32 g/t | 3.09 koz | 62.00 g/t | 0.60 Moz | 0.90% | 2.7 kt Zn | 0.54% | 1.62 kt Pb | 11 Dec 2025 | 4Unverified | notes (3)Ref: 4
|
| Underground | Inferred | 2.20 Mt | 0.31 g/t | 0.02 Moz | 74.00 g/t | 5.23 Moz | 0.40% | 0.01 Mt Zn | 0.29% | 0.01 Mt Pb | 11 Dec 2025 | 4Unverified | notes (3)Ref: 4
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.