These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Fe) | Contained (Mt Fe) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 24.00 Mt | 25.10% | 6.02 Mt Fe | 21 Nov 2025 |
| Inferred | 52.30 Mt | 26.60% | 13.91 Mt Fe | 21 Nov 2025 |
| Total Resources | 76.30 Mt | 26.10% | 19.91 Mt Fe | 21 Nov 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Fe | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Fe) | Contained (Mt Fe) | ||||||
| Total | Indicated | 24.00 Mt | 25.10% | 6.02 Mt Fe | 21 Nov 2025 | 2Unverified | |
notes (2)Ref: 2
|
| Total | Inferred | 52.30 Mt | 26.60% | 13.91 Mt Fe | 21 Nov 2025 | 2Unverified | notes (2)Ref: 2
|
| Total | Total Resources | 76.30 Mt | 26.10% | 19.91 Mt Fe | 21 Nov 2025 | 2Unverified | notes (2)Ref: 2
|
| Byro South | Inferred | 47.00 Mt | 29.00% | 13.63 Mt Fe | 21 Nov 2025 | 2Unverified | notes (3)Ref: 2
QA notes:
|
| Byro South | Total Resources | 47.00 Mt | 29.00% | 13.63 Mt Fe | 21 Nov 2025 | 2Unverified | notes (3)Ref: 2
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.