Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Ni) | Contained (Mt Ni) | As at |
|---|---|---|---|---|
| Measured | 18.00 Mt | 0.94% | 0.17 Mt Ni | 30 June 2023 |
| Indicated | 277.00 Mt | 0.70% | 1.92 Mt Ni | 30 June 2023 |
| Inferred | 289.00 Mt | 0.67% | 1.95 Mt Ni | 30 June 2023 |
| Total Resources | 584.00 Mt | 0.69% | 4.04 Mt Ni | 30 June 2023 |
| Proved | 16.70 Mt | 0.96% | 0.16 Mt Ni | 30 June 2023 |
| Probable | 177.40 Mt | 0.68% | 1.20 Mt Ni | 30 June 2023 |
| Total Reserves | 194.10 Mt | 0.70% | 1.37 Mt Ni | 30 June 2023 |
| Category | Tonnes (Mt) | Grade (% Co) | Contained (Mt Co) | As at |
|---|---|---|---|---|
| Measured | 18.00 Mt | 0.09% | 0.02 Mt Co | 30 June 2023 |
| Indicated | 277.00 Mt | 0.05% | 0.13 Mt Co | 30 June 2023 |
| Inferred | 289.00 Mt | 0.04% | 0.11 Mt Co | 30 June 2023 |
| Total Resources | 584.00 Mt | 0.04% | 0.25 Mt Co | 30 June 2023 |
| Proved | 16.70 Mt | 0.09% | 0.02 Mt Co | 30 June 2023 |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Ni | Co | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (% Ni) | Contained (Mt Ni) | Grade (% Co) | Contained (Mt Co) | ||||||
| Total | Measured | 18.00 Mt | 0.94% | 0.17 Mt Ni | 0.09% | 0.02 Mt Co | 30 June 2023 | 5Unverified | |
| 177.40 Mt | 0.05% |
| 0.08 Mt Co |
| 30 June 2023 |
| Total Reserves | 194.10 Mt | 0.05% | 0.10 Mt Co | 30 June 2023 |
notes (4)Ref: 5
QA notes:
|
| Total | Indicated | 277.00 Mt | 0.70% | 1.92 Mt Ni | 0.05% | 0.13 Mt Co | 30 June 2023 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Total | Inferred | 289.00 Mt | 0.67% | 1.95 Mt Ni | 0.04% | 0.11 Mt Co | 30 June 2023 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Total | Total Resources | 584.00 Mt | 0.69% | 4.04 Mt Ni | 0.04% | 0.25 Mt Co | 30 June 2023 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Big Four | Indicated | 49.00 Mt | 0.71% | 0.35 Mt Ni | 0.05% | 0.02 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
|
| Big Four | Inferred | 14.00 Mt | 0.68% | 0.10 Mt Ni | 0.04% | 0.01 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Black Range | Indicated | 9.00 Mt | 0.67% | 0.06 Mt Ni | 0.09% | 0.01 Mt Co | 30 June 2023 | 23Unverified | notes (5)Ref: 23
QA notes:
|
| Black Range | Inferred | 10.00 Mt | 0.69% | 0.07 Mt Ni | 0.10% | 0.01 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Ghost Rocks | Inferred | 47.00 Mt | 0.66% | 0.31 Mt Ni | 0.04% | 0.02 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Goongarrie Hill | Indicated | 40.00 Mt | 0.65% | 0.26 Mt Ni | 0.04% | 0.02 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
|
| Goongarrie Hill | Inferred | 29.00 Mt | 0.60% | 0.18 Mt Ni | 0.03% | 0.01 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Goongarrie South | Measured | 18.00 Mt | 0.94% | 0.17 Mt Ni | 0.09% | 0.02 Mt Co | 30 June 2023 | 23Unverified | notes (4)Ref: 23
QA notes:
|
| Goongarrie South | Indicated | 82.00 Mt | 0.71% | 0.58 Mt Ni | 0.05% | 0.04 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
|
| Goongarrie South | Inferred | 10.00 Mt | 0.64% | 0.06 Mt Ni | 0.03% | 3 kt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Highway | Indicated | 71.00 Mt | 0.69% | 0.49 Mt Ni | 0.04% | 0.03 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
|
| Highway | Inferred | 21.00 Mt | 0.67% | 0.14 Mt Ni | 0.04% | 0.01 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Scotia Dam | Indicated | 12.00 Mt | 0.71% | 0.08 Mt Ni | 0.07% | 0.01 Mt Co | 30 June 2023 | 23Unverified | notes (4)Ref: 23
QA notes:
|
| Scotia Dam | Inferred | 5.00 Mt | 0.72% | 0.04 Mt Ni | 0.04% | 2 kt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Siberia North | Indicated | 14.00 Mt | 0.72% | 0.10 Mt Ni | 0.04% | 0.01 Mt Co | 30 June 2023 | 23Unverified | notes (4)Ref: 23
QA notes:
|
| Siberia North | Inferred | 72.00 Mt | 0.74% | 0.53 Mt Ni | 0.03% | 0.03 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Siberia South | Inferred | 81.00 Mt | 0.65% | 0.53 Mt Ni | 0.03% | 0.03 Mt Co | 30 June 2023 | 23Unverified | notes (3)Ref: 23
QA notes:
|
| Area | Category | Tonnes (Mt) | Ni | Co | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (% Ni) | Contained (Mt Ni) | Grade (% Co) | Contained (Mt Co) | ||||||
| Total | Proved | 16.70 Mt | 0.96% | 0.16 Mt Ni | 0.09% | 0.02 Mt Co | 30 June 2023 | 21Unverified | notes (4)Ref: 21
QA notes:
|
| Total | Probable | 177.40 Mt | 0.68% | 1.20 Mt Ni | 0.05% | 0.08 Mt Co | 30 June 2023 | 21Unverified | notes (4)Source: |
| Total | Total Reserves | 194.10 Mt | 0.70% | 1.37 Mt Ni | 0.05% | 0.10 Mt Co | 30 June 2023 | 21Unverified | notes (3) |
| Big Four/Scotia Dam | Probable | 35.70 Mt | 0.75% | 0.27 Mt Ni | 0.06% | 0.02 Mt Co | 30 June 2023 | 24Unverified | notes (4) |
| Goongarrie Hill | Probable | 15.90 Mt | 0.70% | 0.11 Mt Ni | 0.04% | 0.01 Mt Co | 30 June 2023 | 24Unverified | notes (3)Ref: 24 |
| Goongarrie South | Proved | 16.70 Mt | 0.96% | 0.16 Mt Ni | 0.09% | 0.02 Mt Co | 30 June 2023 | 24Unverified | notes (4) |
| Goongarrie South | Probable | 35.40 Mt | 0.77% | 0.27 Mt Ni | 0.07% | 0.02 Mt Co | 30 June 2023 | 24Unverified | notes (3)Ref: 24 |
| Highway | Probable | 81.20 Mt | 0.60% | 0.49 Mt Ni | 0.03% | 0.03 Mt Co | 30 June 2023 | 24Unverified | notes (3)Ref: 24 |
| Siberia North | Probable | 9.20 Mt | 0.74% | 0.07 Mt Ni | 0.05% | 4 kt Co | 30 June 2023 | 24Unverified | notes (3)Ref: 24 |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; ARDEA RESOURCES LIMITED holds 65.0% of this project.