These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4.70 Mt | 2.63 g/t | 0.40 Moz | 15 June 2026 |
| Inferred | 15.30 Mt | 1.20 g/t | 0.60 Moz | 15 June 2026 |
| Total Resources | 20.00 Mt | 1.54 g/t | 1.00 Moz | 15 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4.70 Mt | 176.28 g/t | 26.00 Moz | 15 June 2026 |
| Inferred | 15.30 Mt | 56.36 g/t | 28.00 Moz | 15 June 2026 |
| Total Resources | 20.00 Mt | 84.54 g/t | 54.00 Moz | 15 June 2026 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | ||||||
| Total | Total Resources | 20.00 Mt | 1.54 g/t | 1.00 Moz | 84.54 g/t | 54.00 Moz | 15 June 2026 | derived from 4 rows | |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| Open Pit | Indicated | 1.20 Mt | 2.70 g/t | 0.10 Moz | 110.00 g/t | 4.00 Moz | 15 June 2026 | 20Unverified | notes (3)Ref: 20
QA notes:
|
| Open Pit | Inferred | 10.90 Mt | 0.80 g/t | 0.30 Moz | 23.00 g/t | 8.00 Moz | 15 June 2026 | 20Unverified | notes (3)Ref: 20
QA notes:
|
| Underground | Indicated | 3.50 Mt | 2.60 g/t | 0.30 Moz | 199.00 g/t | 22.00 Moz | 15 June 2026 | 20Unverified | notes (3)Ref: 20
QA notes:
|
| Underground | Inferred | 4.40 Mt | 2.20 g/t | 0.30 Moz | 139.00 g/t | 20.00 Moz | 15 June 2026 | 20Unverified | notes (3)Ref: 20
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.