Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes / Vol | Grade (ppm Li) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 269.00 Mm³ | 128 ppm Li | 0.18 Mt LCE | 30 Apr 2026 |
| Inferred | 868.00 Mm³ | 128 ppm Li | 0.59 Mt LCE | 30 Apr 2026 |
| Total Resources | 1,137.00 Mm³ | 128 ppm Li | 0.77 Mt LCE | 30 Apr 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes / Vol | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (ppm Li) | Contained (Mt LCE) | |||||
| Indicated | 269.00 Mm³ | 128 ppm Li | 0.18 Mt LCE | 30 Apr 2026 | 1, 41Unverified | |
notes (4)Ref: 1, 41
QA notes:
|
| Inferred | 868.00 Mm³ | 128 ppm Li | 0.59 Mt LCE | 30 Apr 2026 | 1, 41Unverified | notes (4)Ref: 1, 41
QA notes:
|
| Total Resources | 1,137.00 Mm³ | 128 ppm Li | 0.77 Mt LCE | 30 Apr 2026 | 1Unverified | notes (4)Ref: 1
QA notes:
|