These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 0.13 Mt | 0.90 g/t | 4 koz | 23 June 2026 |
| Indicated | 10.07 Mt | 1.40 g/t | 0.46 Moz | 23 June 2026 |
| Inferred | 1.32 Mt | 1.70 g/t | 0.07 Moz | 23 June 2026 |
| Total Resources | 0.52 Mt | 6.18 g/t | 0.10 Moz | 23 June 2026 |
| Proved | 0.10 Mt | 0.79 g/t | 3.4 koz | 20 Aug 2026 |
| Probable | 10.90 Mt | 1.21 g/t | 0.43 Moz | 20 Aug 2026 |
| Total Reserves | 11.00 Mt | 1.20 g/t | 0.43 Moz | 20 Aug 2026 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Iguana Deposit | Measured | 0.13 Mt | 0.90 g/t | 4 koz | 23 June 2026 | 12Unverified | |
notes (6)Ref: 12
QA notes:
|
| Iguana Deposit | Indicated | 10.07 Mt | 1.40 g/t | 0.46 Moz | 23 June 2026 | 12Unverified | notes (6)Ref: 12
QA notes:
|
| Iguana Deposit | Inferred | 1.32 Mt | 1.70 g/t | 0.07 Moz | 23 June 2026 | 12Unverified | notes (5)Ref: 12
QA notes:
|
| Iguana Deposit | Total Resources | 0.52 Mt | 6.18 g/t | 0.10 Moz | 23 June 2026 | 12Unverified | notes (6)Ref: 12
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Iguana Deposit | Proved | 0.10 Mt | 0.79 g/t | 3.4 koz | 20 Aug 2026 | 4Unverified | notes (6)Ref: 4
QA notes:
|
| Iguana Deposit | Probable | 10.90 Mt | 1.21 g/t | 0.43 Moz | 20 Aug 2026 | 4Unverified | notes (6) |
| Iguana Deposit | Total Reserves | 11.00 Mt | 1.20 g/t | 0.43 Moz | 20 Aug 2026 | 4Unverified | |
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
notes (6)Ref: 4
QA notes:
|