These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 97.78 Mt | 9.00 g/t | 28.29 Moz | 30 June 2026 |
| Indicated | 240.00 Mt | 11.00 g/t | 84.88 Moz | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 337.78 Mt | 10.00 g/t | 108.60 Moz | 30 June 2026 |
| Inferred | 1,256.30 Mt | 10.00 g/t | 403.91 Moz | 30 June 2026 |
| Total Resources | 1,594.07 Mt | 10.09 g/t | 517.08 Moz | 30 June 2026 |
| Proved | 245.93 Mt | 10.00 g/t | 79.07 Moz | 30 June 2026 |
| Probable | 257.78 Mt | 13.00 g/t | 107.74 Moz | 30 June 2026 |
| Total Reserves | 503.70 Mt | 11.00 g/t | 178.14 Moz | 30 June 2026 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 97.78 Mt | 0.66% | 0.65 Mt Cu | 30 June 2026 |
| Indicated | 240.00 Mt | 0.83% | 1.99 Mt Cu | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 337.78 Mt | 0.78% | 2.63 Mt Cu | 30 June 2026 |
| Inferred | 1,256.30 Mt | 0.97% | 12.19 Mt Cu | 30 June 2026 |
| Total Resources |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | 97.78 Mt | 0.27% | 0.26 Mt Zn | 30 June 2026 |
| Indicated | 240.00 Mt | 0.54% | 1.30 Mt Zn | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 337.78 Mt | 0.46% | 1.55 Mt Zn | 30 June 2026 |
| Inferred | 1,256.30 Mt | 0.44% | 5.53 Mt Zn | 30 June 2026 |
| Total Resources |
| Category | Tonnes (Mt) | Grade (% Mo) | Contained (Mt Mo) | As at |
|---|---|---|---|---|
| Measured | 97.78 Mt | 0.01% | 0.01 Mt Mo | 30 June 2026 |
| Indicated | 240.00 Mt | 0.02% | 0.04 Mt Mo | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 337.78 Mt | 0.02% | 0.06 Mt Mo | 30 June 2026 |
| Inferred | 1,256.30 Mt | 0.02% | 0.23 Mt Mo | 30 June 2026 |
| Total Resources |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Ag | Cu | Zn | Mo | As at | Source | Provenance | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Mo) | Contained (Mt Mo) | |||||
| Measured | 97.78 Mt | 9.00 g/t | 28.29 Moz | 0.66% | 0.65 Mt Cu | 0.27% | ||||||
| 0.93% |
| 14.82 Mt Cu |
| 30 June 2026 |
| Proved | 245.93 Mt | 0.82% | 2.02 Mt Cu | 30 June 2026 |
| Probable | 257.78 Mt | 0.97% | 2.50 Mt Cu | 30 June 2026 |
| Total Reserves | 503.70 Mt | 0.90% | 4.53 Mt Cu | 30 June 2026 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| 0.44% |
| 7.09 Mt Zn |
| 30 June 2026 |
| Proved | 245.93 Mt | 0.43% | 1.06 Mt Zn | 30 June 2026 |
| Probable | 257.78 Mt | 0.75% | 1.93 Mt Zn | 30 June 2026 |
| Total Reserves | 503.70 Mt | 0.59% | 2.97 Mt Zn | 30 June 2026 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
| 0.02% |
| 0.28 Mt Mo |
| 30 June 2026 |
| Proved | 245.93 Mt | 0.02% | 0.06 Mt Mo | 30 June 2026 |
| Probable | 257.78 Mt | 0.02% | 0.06 Mt Mo | 30 June 2026 |
| Total Reserves | 503.70 Mt | 0.02% | 0.12 Mt Mo | 30 June 2026 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| 0.01% | 0.01 Mt Mo |
| 30 June 2026 |
| 6.1 Copper Mineral resources As at 30 June 2026Unverified |
notes (6)Ref: 6.1 Copper Mineral resources As at 30 June 2026
QA notes:
|
| Indicated | 240.00 Mt | 11.00 g/t | 84.88 Moz | 0.83% | 1.99 Mt Cu | 0.54% | 1.30 Mt Zn | 0.02% | 0.04 Mt Mo | 30 June 2026 | 6.1 Copper Mineral resources As at 30 June 2026Unverified | notes (6)Ref: 6.1 Copper Mineral resources As at 30 June 2026
QA notes:
|
| M&I = Measured + Indicated (overlaps both) | 337.78 Mt | 10.00 g/t | 108.60 Moz | 0.78% | 2.63 Mt Cu | 0.46% | 1.55 Mt Zn | 0.02% | 0.06 Mt Mo | 30 June 2026 | 6.1 Copper Mineral resources As at 30 June 2026Unverified | notes (6)Ref: 6.1 Copper Mineral resources As at 30 June 2026
QA notes:
|
| Inferred | 1,256.30 Mt | 10.00 g/t | 403.91 Moz | 0.97% | 12.19 Mt Cu | 0.44% | 5.53 Mt Zn | 0.02% | 0.23 Mt Mo | 30 June 2026 | 6.1 Copper Mineral resources As at 30 June 2026Unverified | notes (6)Ref: 6.1 Copper Mineral resources As at 30 June 2026
QA notes:
|
| Total Resources | 1,594.07 Mt | 10.09 g/t | 517.08 Moz | 0.93% | 14.82 Mt Cu | 0.44% | 7.09 Mt Zn | 0.02% | 0.28 Mt Mo | 30 June 2026 | derived from 3 rows | — |
| Category | Tonnes (Mt) | Ag | Cu | Zn | Mo | As at | Source | Provenance | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Mo) | Contained (Mt Mo) | |||||
| Proved | 245.93 Mt | 10.00 g/t | 79.07 Moz | 0.82% | 2.02 Mt Cu | 0.43% | 1.06 Mt Zn | 0.02% | 0.06 Mt Mo | 30 June 2026 | 6.1 Copper Mineral reserves As at 30 June 2026Unverified | notes (6)Ref: 6.1 Copper Mineral reserves As at 30 June 2026
QA notes:
|
| Probable | 257.78 Mt | 13.00 g/t | 107.74 Moz | 0.97% | 2.50 Mt Cu | 0.75% | 1.93 Mt Zn | 0.02% | 0.06 Mt Mo | 30 June 2026 | 6.1 Copper Mineral reserves As at 30 June 2026Unverified | notes (6) |
| Total Reserves | 503.70 Mt | 11.00 g/t | 178.14 Moz | 0.90% | 4.53 Mt Cu | 0.59% | 2.97 Mt Zn | 0.02% | 0.12 Mt Mo | 30 June 2026 | 6.1 Copper Mineral reserves As at 30 June 2026Unverified | notes (6) |
Rows are hierarchical, not additive — do not sum a column across rows. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; BHP GROUP LIMITED holds 33.8% of this project.