Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 150.90 Mt | 1.00 g/t | 4.70 Moz | 27 July 2026 |
| Inferred | 38.10 Mt | 0.80 g/t | 0.97 Moz | 27 July 2026 |
| Total Resources | 69.60 Mt | 0.89 g/t | 2.00 Moz | 27 July 2026 |
| Proved | 0.00 Mt | 0.00 g/t | 0.00 Moz | 27 July 2026 |
| Probable | 238.60 Mt | 0.98 g/t | 7.34 Moz | 27 July 2026 |
| Total Reserves | 119.30 Mt | 1.00 g/t | 3.67 Moz | 31 Mar 2026 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Indicated | 150.90 Mt | 1.00 g/t | 4.70 Moz | 27 July 2026 | 18Unverified | |
notes (9)Ref: 18
QA notes:
|
| Total | Inferred | 38.10 Mt | 0.80 g/t | 0.97 Moz | 27 July 2026 | 18Unverified | notes (6)Ref: 18
QA notes:
|
| Total | Total Resources | 69.60 Mt | 0.89 g/t | 2.00 Moz | 27 July 2026 | 18Unverified | notes (6)Ref: 18
QA notes:
|
| Fresh Open Pit | Indicated | 86.70 Mt | 0.90 g/t | 2.51 Moz | 22 July 2025 | 9Unverified | notes (4)Ref: 9
|
| Fresh Open Pit | Inferred | 20.80 Mt | 0.70 g/t | 0.46 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Fresh Open Pit | Total Resources | 107.50 Mt † | 0.90 g/t † | 0.00 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Highway Open Pit | Indicated | 3.00 Mt | 0.90 g/t | 0.09 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Highway Open Pit | Inferred | 0.90 Mt | 0.70 g/t | 0.02 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Highway Open Pit | Total Resources | 3.90 Mt † | 0.90 g/t † | 0.00 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| HLP Stockpile | Indicated | 3.70 Mt | 0.40 g/t | 0.05 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| HLP Stockpile | Inferred | 0.30 Mt | 0.40 g/t | 4 koz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| HLP Stockpile | Total Resources | 4.00 Mt † | 0.40 g/t † | 0.00 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Laterite Open Pit | Indicated | 0.80 Mt | 0.60 g/t | 0.01 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Laterite Open Pit | Inferred | 1.30 Mt | 0.60 g/t | 0.02 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Laterite Open Pit | Total Resources | 2.10 Mt † | 0.60 g/t † | 0.00 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Orion South Underground | Inferred | 6.80 Mt | 3.10 g/t | 0.68 Moz | 22 July 2025 | 9Unverified | notes (4)Ref: 9
|
| Orion South Underground | Total Resources | 6.80 Mt † | 3.10 g/t † | 0.00 Moz | 22 July 2025 | 9Unverified | notes (4)Ref: 9
|
| Oxide Open Pit | Indicated | 10.70 Mt | 0.80 g/t | 0.29 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Oxide Open Pit | Inferred | 0.30 Mt | 0.70 g/t | 0.01 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Oxide Open Pit | Total Resources | 11.00 Mt † | 0.80 g/t † | 0.00 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Transitional Open Pit | Indicated | 13.30 Mt | 0.80 g/t | 0.34 Moz | 22 July 2025 | 9Unverified | notes (4)Ref: 9
|
| Transitional Open Pit | Inferred | 0.60 Mt | 0.70 g/t | 0.01 Moz | 22 July 2025 | 9Unverified | notes (5)Ref: 9
QA notes:
|
| Transitional Open Pit | Total Resources | 13.90 Mt † | 0.80 g/t † | 0.00 Moz | 22 July 2025 | 9Unverified | notes (4)Ref: 9
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Reserves | 119.30 Mt | 1.00 g/t | 3.67 Moz | 31 Mar 2026 | Compelling Mt Gibson PFS UpdateUnverified | notes (2)
QA notes:
|
| Proved | 0.00 Mt | 0.00 g/t | 0.00 Moz | 27 July 2026 | Diggers and Dealers Mining Forum PresentationManual entry | notes (3) | |
| Probable | 119.30 Mt | 1.00 g/t | 3.67 Moz | 27 July 2026 | Diggers and Dealers Mining Forum PresentationManual entry | notes (3)Source: | |
| Open Pit | Probable | 114.30 Mt | 0.90 g/t | 3.31 Moz | 27 July 2026 | 19Unverified | notes (4) |
| Underground (HG) | Probable | 3.20 Mt | 2.70 g/t | 0.28 Moz | 27 July 2026 | 19Unverified | |
| Underground (LG) | Probable | 1.80 Mt | 1.60 g/t | 0.09 Moz | 27 July 2026 | 19Unverified | |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
† Total-row tonnes/grade as published (not net): the reserve statement prints no tonnage to net out, so only the contained figure honours the Resources treatment there.