Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 11.73 Mt | 0.33 g/t | 0.13 Moz | 18 June 2026 |
| Inferred | 6.05 Mt | 0.53 g/t | 0.10 Moz | 18 June 2026 |
| Total Resources | 17.77 Mt | 0.40 g/t | 0.23 Moz | 18 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 11.73 Mt | 3.13 g/t | 1.18 Moz | 18 June 2026 |
| Inferred | 6.05 Mt | 5.10 g/t | 0.99 Moz | 18 June 2026 |
| Total Resources | 17.77 Mt | 3.80 g/t | 2.17 Moz | 18 June 2026 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 11.73 Mt | 1.91% | 0.22 Mt Cu | 18 June 2026 |
| Inferred | 6.05 Mt | 1.95% | 0.12 Mt Cu | 18 June 2026 |
| Total Resources | 17.77 Mt | 1.92% | 0.34 Mt Cu | 18 June 2026 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | |||||
| Indicated | 11.73 Mt | 0.33 g/t | 0.13 Moz | 3.13 g/t | 1.18 Moz | 1.91% | 0.22 Mt Cu | 18 June 2026 | ||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (5)Ref: 7
QA notes:
|
| Inferred | 6.05 Mt | 0.53 g/t | 0.10 Moz | 5.10 g/t | 0.99 Moz | 1.95% | 0.12 Mt Cu | 18 June 2026 | 7Unverified | notes (4)Ref: 7
|
| Total Resources | 17.77 Mt | 0.40 g/t | 0.23 Moz | 3.80 g/t | 2.17 Moz | 1.92% | 0.34 Mt Cu | 18 June 2026 | 7Unverified | notes (4)Ref: 7
|
Figures are on a 100% project basis unless a row carries the attrib chip; CUFE LTD holds 55.0% of this project.