Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 3.80 Mt | 2.42 g/t | 0.30 Moz | 18 Mar 2026 |
| Inferred | 0.70 Mt | 1.40 g/t | 0.03 Moz | 18 Mar 2026 |
| Total Resources | 4.50 Mt | 2.26 g/t | 0.33 Moz | 18 Mar 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4.94 Mt | 3.48 g/t | 0.56 Moz | 18 Mar 2026 |
| Inferred | 0.74 Mt | 7.60 g/t | 0.18 Moz | 18 Mar 2026 |
| Total Resources | 5.68 Mt | 4.01 g/t | 0.74 Moz | 18 Mar 2026 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 3.80 Mt | 1.14% | 0.04 Mt Cu | 18 Mar 2026 |
| Inferred | 0.70 Mt | 0.94% | 0.01 Mt Cu | 18 Mar 2026 |
| Total Resources | 4.50 Mt | 1.11% | 0.05 Mt Cu | 18 Mar 2026 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | |||||
| Indicated | 3.80–4.94 Mt | 2.42 g/t | 0.30 Moz | 3.48 g/t | 0.56 Moz | 1.14% | 0.04 Mt Cu | 18 Mar 2026 | ||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| 13Unverified |
notes (2)Ref: 13
|
| Inferred | 0.70–0.74 Mt | 1.40 g/t | 0.03 Moz | 7.60 g/t | 0.18 Moz | 0.94% | 0.01 Mt Cu | 18 Mar 2026 | 13Unverified | notes (2)Ref: 13
|
| Total Resources | 4.50–5.68 Mt | 2.26 g/t | 0.33 Moz | 4.01 g/t | 0.74 Moz | 1.11% | 0.05 Mt Cu | 18 Mar 2026 | 2, 8Unverified | notes (3)Ref: 2, 8
QA notes:
|
Figures are on a 100% project basis unless a row carries the attrib chip; CUFE LTD holds 55.0% of this project.