These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 6.23 Mt | 0.30% | 0.02 Mt Cu | 26 Sept 2018 |
| Inferred | 1.24 Mt | 0.28% | 3.5 kt Cu | 26 Sept 2018 |
| Total Resources | 7.47 Mt | 0.30% | 0.02 Mt Cu | 26 Sept 2018 |
| Proved | — | — | — | — |
| Probable | 3.70 Mt | 0.13% | 4.8 kt Cu | 03 Aug 2015 |
| Total Reserves | 3.70 Mt | 0.13% | 4.8 kt Cu | 03 Aug 2015 |
| Category | Tonnes (Mt) | Grade (% Sn) | Contained (Mt Sn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 6.23 Mt | 0.75% | 0.05 Mt Sn | 26 Sept 2018 |
| Inferred | 1.24 Mt | 0.76% | 0.01 Mt Sn | 26 Sept 2018 |
| Total Resources | 7.47 Mt | 0.75% | 0.06 Mt Sn | 26 Sept 2018 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Cu | Sn | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Sn) | Contained (Mt Sn) | ||||||
| Total | Indicated | 6.23 Mt | 0.30% | 0.02 Mt Cu | 0.75% | 0.05 Mt Sn | 26 Sept 2018 | 2Unverified | |
| 0.29% |
| 0.01 Mt Sn |
| 03 Aug 2015 |
| Total Reserves | 3.70 Mt | 0.29% | 0.01 Mt Sn | 03 Aug 2015 |
notes (3)Ref: 2
QA notes:
|
| Total | Inferred | 1.24 Mt | 0.28% | 3.5 kt Cu | 0.76% | 0.01 Mt Sn | 26 Sept 2018 | 2Unverified | notes (3)Ref: 2
QA notes:
|
| Total | Total Resources | 7.47 Mt | 0.30% | 0.02 Mt Cu | 0.75% | 0.06 Mt Sn | 26 Sept 2018 | 2Unverified | notes (3)Ref: 2
QA notes:
|
| Area | Category | Tonnes (Mt) | Cu | Sn | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Sn) | Contained (Mt Sn) | ||||||
| Tailings | Probable | 3.70 Mt | 0.13% | 4.8 kt Cu | 0.29% | 0.01 Mt Sn | 03 Aug 2015 | 33Unverified | notes (10)Ref: 33
QA notes:
|
| Tailings | Total Reserves | 3.70 Mt | 0.13% | 4.8 kt Cu | 0.29% | 0.01 Mt Sn | 03 Aug 2015 | 33Unverified | notes (5) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.