These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | 8.66 Mt | 0.37% | 0.03 Mt Zn | 29 Nov 2023 |
| Indicated | 14.05 Mt | 0.39% | 0.05 Mt Zn | 29 Nov 2023 |
| M&I = Measured + Indicated (overlaps both) | 22.72 Mt | 0.38% | 0.09 Mt Zn | 29 Nov 2023 |
| Inferred | 1.03 Mt | 1.32% | 0.01 Mt Zn | 29 Nov 2023 |
| Total Resources | 23.75 Mt | 0.42% | 0.10 Mt Zn | 29 Nov 2023 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| Category | Tonnes (Mt) | Grade (% Sn) | Contained (Mt Sn) | As at |
|---|---|---|---|---|
| Measured | 7.42 Mt | 0.36% | 0.03 Mt Sn | 14 Feb 2023 |
| Indicated | 11.11 Mt | 0.41% | 0.05 Mt Sn | 14 Feb 2023 |
| M&I = Measured + Indicated (overlaps both) | 18.53 Mt | 0.39% | 0.07 Mt Sn | 14 Feb 2023 |
| Inferred | 1.07 Mt | 0.38% | 4.02 kt Sn | 14 Feb 2023 |
| Total Resources |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Zn | Sn | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (% Zn) | Contained (Mt Zn) | Grade (% Sn) | Contained (Mt Sn) | |||||
| Measured | 7.42–8.66 Mt | 0.37% | 0.03 Mt Zn | 0.36% | 0.03 Mt Sn | 29 Nov 2023 * | 32 | |
| 0.39% |
| 0.08 Mt Sn |
| 14 Feb 2023 |
| Proved | 6.10 Mt | 0.34% | 0.02 Mt Sn | 04 Apr 2025 |
| Probable | 9.80 Mt | 0.37% | 0.04 Mt Sn | 04 Apr 2025 |
| Total Reserves | 16.00 Mt | 0.36% | 0.06 Mt Sn | 04 Apr 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
notes (9)Ref: 32
QA notes:
|
| Indicated | 11.11–14.05 Mt | 0.39% | 0.05 Mt Zn | 0.41% | 0.05 Mt Sn | 29 Nov 2023 * | 32Unverified | notes (4)Ref: 32
QA notes:
|
| M&I = Measured + Indicated (overlaps both) | 18.53–22.72 Mt | 0.38% | 0.09 Mt Zn | 0.39% | 0.07 Mt Sn | 29 Nov 2023 * | 32Unverified | notes (4)Ref: 32
QA notes:
|
| Inferred | 1.03–1.07 Mt | 1.32% | 0.01 Mt Zn | 0.38% | 4.02 kt Sn | 29 Nov 2023 * | 32Unverified | notes (4)Ref: 32
QA notes:
|
| Total Resources | 19.60–23.75 Mt | 0.42% | 0.10 Mt Zn | 0.39% | 0.08 Mt Sn | 29 Nov 2023 * | 32Unverified | notes (4)Ref: 32
QA notes:
|
| Category | Tonnes (Mt) | Zn | Sn | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (% Zn) | Contained (Mt Zn) | Grade (% Sn) | Contained (Mt Sn) | |||||
| Proved | 6.10 Mt | — | — | 0.34% | 0.02 Mt Sn | 04 Apr 2025 | 32Unverified | notes (9)Ref: 32
QA notes:
|
| Probable | 9.80 Mt | — | — | 0.37% | 0.04 Mt Sn | 04 Apr 2025 | 32Unverified | notes (5) |
| Total Reserves | 16.00 Mt | — | — | 0.36% | 0.06 Mt Sn | 04 Apr 2025 | 32Unverified | notes (4) |
Rows are hierarchical, not additive — do not sum a column across rows. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.