Bridge Creek South
Northern Territory, Australia · ExploringUnverified
Current R&R by category
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
Category
Tonnes (Mt)
Grade (g/t Au)
Contained (Moz Au)
As at
Measured
—
—
—
—
Indicated
—
—
—
—
Inferred
0.70 Mt
0.80 g/t
0.02 Moz
12 June 2026
Total Resources
0.70 Mt
0.80 g/t
0.02 Moz
12 June 2026
Proved
—
—
—
—
Probable
—
—
—
—
Total Reserves
—
—
—
—
Cut-off grade
0.5000 g/t Au
Price assumption
—
JORC code year
2012
Peer benchmark — exploring Au projects (297 with resources)Resource size P6Resource grade P35View on grade-tonnage chart →
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
Cutoff 0.50 g/t Au — Cut-off grade assumption from the source statement.
QA notes:
QA BLOCK: recomputed contained 0.0000 oz vs reported 1000 oz (100.00% disagreement)
t92 hold: (a8) ZERO-TONNAGE row: stored tonnes = 0.0000 alongside contained 1,000 oz, an arithmetically impossible pair (QA BLOCK 100.00%). Not an F3 defect and not an extraction error — Table 3 literally prints "Bridge Creek South
Trans
0.5
0.0
0.70
1", and the F3 group flag itself is a rounding false positive (ounces 5+1+11 = 17 = printed Total 17 exactly; see 254c90ea). The problem is that "0.0" in a 0.1 Mt column denotes a positive tonnage below 50,000 t, not zero: the row's own printed cells fix it at 1,000 x 31.1035 / 0.70 = 44,434 t, and only that value makes the table foot (189,655 + 44,434 + 427,673 = 661,762 t, printing the 0.7 Mt Total at 0.80 g/t). Stored as 0 it asserts 1,000 oz in zero tonnes, can never reconcile, and silently removes ~44 kt from every FNR tonnage aggregation — it is the entire reason the split-tonnage sum reads 0.6 Mt against 0.7 Mt. No FIX proposed: the document prints no non-zero tonnage for this domain, so any replacement is a back-calculation rather than a printed figure (cf. the accepted t67 SCOT oz/grade back-calc precedent) — operator's call whether to null the tonnage or carry 44,434 t. Grade 0.70 g/t and contained 1,000 oz are printed and sound.
t92a swarm-r3
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
t94 B3: printed 'Bridge Creek South Trans 0.5 0.0 0.70 1 0.0 0.70 1' - the 0.0 is a 0.1 Mt DISPLAY ROUNDING of a sub-50 kt tonnage (the row's own 0.70 g/t and 1 koz imply ~44,434 t), not a true zero. The row is a real printed estimate: it carries a cut-off, a grade and a contained figure, and it participates in the issuer's own Trans and Bridge Creek South totals. Tonnage aggregations must not read it as zero; the standing 100% recompute BLOCK is expected and is not a defect. No field change (ops/t94_verified.md §B3)