Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 0.15 Mt | 1.18 g/t | 0.01 Moz | 05 June 2026 |
| Indicated | 0.89 Mt | 1.09 g/t | 0.03 Moz | 05 June 2026 |
| Inferred | 0.96 Mt | 1.20 g/t | 0.04 Moz | 05 June 2026 |
| Total Resources | 2.00 Mt | 1.15 g/t | 0.07 Moz | 05 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Measured | 0.15 Mt | 1.18 g/t | 0.01 Moz | 05 June 2026 | 4, 5Unverified | |
notes (3)Ref: 4, 5
QA notes:
|
| Indicated | 0.89 Mt | 1.09 g/t | 0.03 Moz | 05 June 2026 | 4, 5Unverified | notes (2)Ref: 4, 5
|
| Inferred | 0.96 Mt | 1.20 g/t | 0.04 Moz | 05 June 2026 | 4, 5Unverified | notes (2)Ref: 4, 5
|
| Total Resources | 2.00 Mt | 1.15 g/t | 0.07 Moz | 05 June 2026 | Unverified | — |