Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 32.90 Mt | 1.04% Li2O | 0.85 Mt LCE | 12 June 2024 |
| Inferred | 18.70 Mt | 0.92% Li2O | 0.43 Mt LCE | 12 June 2024 |
| Total Resources | 32.20 Mt | 1.06% Li2O | 0.84 Mt LCE | 12 June 2024 |
| Proved | — | — | — | — |
| Probable | 19.40 Mt | 0.91% Li2O | 0.44 Mt LCE | 04 Dec 2025 |
| Total Reserves | 19.40 Mt | 0.91% Li2O | 0.44 Mt LCE | 04 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Indicated | 32.90 Mt | 1.04% Li2O | 0.85 Mt LCE | 12 June 2024 | 13Unverified | |
notes (3)Ref: 13
|
| Total | Inferred | 18.70 Mt | 0.92% Li2O | 0.43 Mt LCE | 12 June 2024 | 13Unverified | notes (3)Ref: 13
|
| Total | Total Resources | 32.20 Mt | 1.06% Li2O | 0.84 Mt LCE | 12 June 2024 | 13Unverified | notes (3)Ref: 13
|
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Total Reserves | 19.40 Mt | 0.91% Li2O | 0.44 Mt LCE | 04 Dec 2025 | 13Unverified | notes (3)Ref: 13
QA notes:
|
| Open Cut | Probable | 14.40 Mt | 0.93% Li2O | 0.33 Mt LCE | 04 Dec 2025 | 13Unverified | notes (4) |
| Underground | Probable | 5.00 Mt | 0.84% Li2O | 0.10 Mt LCE | 04 Dec 2025 | 13Unverified | notes (4) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.