Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 3.80 Mt | 0.97% Li2O | 0.09 Mt LCE | 15 Dec 2022 |
| Inferred | 14.20 Mt | 1.01% Li2O | 0.35 Mt LCE | 15 Dec 2022 |
| Total Resources | 18.00 Mt | 1.00% Li2O | 0.45 Mt LCE | 15 Dec 2022 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | |||||
| Indicated | 3.80 Mt | 0.97% Li2O | 0.09 Mt LCE | 15 Dec 2022 | 13Unverified | |
notes (4)Ref: 13
QA notes:
|
| Inferred | 14.20 Mt | 1.01% Li2O | 0.35 Mt LCE | 15 Dec 2022 | 13Unverified | notes (4)Ref: 13
QA notes:
|
| Total Resources | 18.00 Mt | 1.00% Li2O | 0.45 Mt LCE | 15 Dec 2022 | 13Unverified | notes (4)Ref: 13
QA notes:
|