These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | 3.80 Mt | 1.31 g/t | 0.16 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | 9.20 Mt | 1.00 g/t | 0.28 Moz | 31 Dec 2025 |
| Total Reserves | 9.20 Mt | 1.00 g/t | 0.28 Moz | 31 Dec 2025 |
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Total Resources | 3.80 Mt | 1.31 g/t | 0.16 Moz | 31 Dec 2025 | 40Unverified | |
notes (4)Ref: 40
QA notes:
|
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Probable | 9.20 Mt | 1.00 g/t | 0.28 Moz | 31 Dec 2025 | 5Unverified | notes (4)Ref: 5
QA notes:
|
| Total Reserves | 9.20 Mt | 1.00 g/t | 0.28 Moz | 31 Dec 2025 | 5Unverified | notes (4) |
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.