Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | — | — | — | — |
| Probable | 0.80 Mt | 1.60 g/t | 0.04 Moz | 31 Dec 2025 |
| Total Reserves | 0.80 Mt | 1.60 g/t | 0.04 Moz | 31 Dec 2025 |
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Probable | 0.80 Mt | 1.60 g/t | 0.04 Moz | 31 Dec 2025 | 5Unverified | |
notes (2)Ref: 5
|
| Total Reserves | 0.80 Mt | 1.60 g/t | 0.04 Moz | 31 Dec 2025 | 5Unverified | notes (2)Ref: 5
|