These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | 1.00 Mt | 2.60% Li2O | 0.06 Mt LCE | 31 Dec 2024 |
| Indicated | 390.00 Mt | 1.50% Li2O | 14.47 Mt LCE | 31 Dec 2024 |
| Inferred | 49.00 Mt | 1.10% Li2O | 1.33 Mt LCE | 31 Dec 2024 |
| Total Resources | 101.00 Mt | 0.00% Li2O | 0.00 Mt LCE | 31 Dec 2024 |
| Proved | 1.00 Mt | 2.60% Li2O | 0.06 Mt LCE | 31 Dec 2024 |
| Probable | 171.00 Mt | 1.90% Li2O | 8.03 Mt LCE | 31 Dec 2024 |
| Total Reserves | 172.00 Mt | 1.90% Li2O | 8.08 Mt LCE | 31 Dec 2024 |
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Measured | 1.00 Mt | 2.60% Li2O | 0.06 Mt LCE | 31 Dec 2024 | 12Unverified | |
notes (3)Ref: 12
QA notes:
|
| Total | Indicated | 390.00 Mt | 1.50% Li2O | 14.47 Mt LCE | 31 Dec 2024 | 12Unverified | notes (3)Ref: 12
QA notes:
|
| Total | Inferred | 49.00 Mt | 1.10% Li2O | 1.33 Mt LCE | 31 Dec 2024 | 12Unverified | notes (3)Ref: 12
QA notes:
|
| Total | Total Resources | 101.00 Mt | 0.00% Li2O | 0.00 Mt LCE | 31 Dec 2024 | Unverified | — |
| Central Lode | Indicated | 331.00 Mt | 1.50% Li2O | 12.28 Mt LCE | 31 Dec 2024 | 12Unverified | notes (4)Ref: 12
QA notes:
|
| Central Lode | Inferred | 39.00 Mt | 1.00% Li2O | 0.96 Mt LCE | 31 Dec 2024 | 12Unverified | notes (4)Ref: 12
QA notes:
|
| Kapanga | Indicated | 48.00 Mt | 1.70% Li2O | 2.02 Mt LCE | 31 Dec 2024 | 12Unverified | notes (4)Ref: 12
QA notes:
|
| Kapanga | Inferred | 9.00 Mt | 1.40% Li2O | 0.31 Mt LCE | 31 Dec 2024 | 12Unverified | notes (4)Ref: 12
QA notes:
|
| Stockpiles | Measured | 1.00 Mt | 2.60% Li2O | 0.06 Mt LCE | 31 Dec 2024 | 12Unverified | notes (4)Ref: 12
QA notes:
|
| Stockpiles | Indicated | 1.00 Mt | 2.30% Li2O | 0.06 Mt LCE | 31 Dec 2024 | 12Unverified | notes (4)Ref: 12
QA notes:
|
| Stockpiles | Inferred | 2.00 Mt | 1.40% Li2O | 0.07 Mt LCE | 31 Dec 2024 | 12Unverified | notes (4)Ref: 12
QA notes:
|
| TSF1 | Indicated | 10.00 Mt | 1.20% Li2O | 0.30 Mt LCE | 31 Dec 2024 | 12Unverified | notes (4)Ref: 12
QA notes:
|
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Proved | 1.00 Mt | 2.60% Li2O | 0.06 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3)Ref: 13
QA notes:
|
| Total | Probable | 171.00 Mt | 1.90% Li2O | 8.03 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3)Source: |
| Total | Total Reserves | 172.00 Mt | 1.90% Li2O | 8.08 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| Central Lode | Probable | 128.00 Mt | 1.90% Li2O | 6.01 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| Central Lode | Total Reserves | 128.00 Mt | 1.90% Li2O | 6.01 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| Kapanga | Probable | 38.00 Mt | 1.90% Li2O | 1.79 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| Kapanga | Total Reserves | 38.00 Mt | 1.90% Li2O | 1.79 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| Stockpiles | Proved | 1.00 Mt | 2.60% Li2O | 0.06 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| Stockpiles | Probable | 1.00 Mt | 2.30% Li2O | 0.06 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| Stockpiles | Total Reserves | 2.00 Mt | 2.30% Li2O | 0.11 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| TSF1 | Probable | 3.00 Mt | 1.30% Li2O | 0.10 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
| TSF1 | Total Reserves | 3.00 Mt | 1.30% Li2O | 0.10 Mt LCE | 31 Dec 2024 | 13Unverified | notes (3) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; IGO LIMITED holds 25.0% of this project.