| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 9.70 Mt | 2.94 g/t | 0.91 Moz | 07 Feb 2023 |
| Inferred | 6.49 Mt | 2.51 g/t | 0.53 Moz | 07 Feb 2023 |
| Total Resources | 16.19 Mt | 2.74 g/t | 1.44 Moz | 07 Feb 2023 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Mt Olympus | Indicated | 8.90 Mt | 2.90 g/t | 0.82 Moz | 07 Feb 2023 | 5Unverified | |
notes (3)Ref: 5
QA notes:
|
| Mt Olympus | Inferred | 3.35 Mt | 2.30 g/t | 0.25 Moz | 07 Feb 2023 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Mt Olympus | Total Resources | 12.24 Mt | 2.70 g/t | 1.07 Moz | 07 Feb 2023 | 5Unverified | notes (2)Ref: 5
|
| Peake | Indicated | 0.35 Mt | 5.30 g/t | 0.06 Moz | 07 Feb 2023 | 5Unverified | notes (2)Ref: 5
|
| Peake | Inferred | 1.57 Mt | 3.00 g/t | 0.15 Moz | 07 Feb 2023 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Peake | Total Resources | 1.92 Mt | 3.40 g/t | 0.21 Moz | 07 Feb 2023 | 5Unverified | notes (2)Ref: 5
|
| Waugh | Indicated | 0.22 Mt | 2.00 g/t | 0.01 Moz | 07 Feb 2023 | 5Unverified | notes (2)Ref: 5
|
| Waugh | Inferred | 0.29 Mt | 1.90 g/t | 0.02 Moz | 07 Feb 2023 | 5Unverified | notes (2)Ref: 5
|
| Waugh | Total Resources | 0.51 Mt | 1.90 g/t | 0.03 Moz | 07 Feb 2023 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Zeus | Indicated | 0.24 Mt | 2.00 g/t | 0.02 Moz | 07 Feb 2023 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Zeus | Inferred | 1.28 Mt | 2.60 g/t | 0.11 Moz | 07 Feb 2023 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Zeus | Total Resources | 1.52 Mt | 2.50 g/t | 0.12 Moz | 07 Feb 2023 | 5Unverified | notes (2)Ref: 5
|