These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4.23 Mt | 1.04 g/t | 0.14 Moz | 26 Aug 2026 |
| Inferred | 6.47 Mt | 1.01 g/t | 0.19 Moz | 26 Aug 2026 |
| Total Resources | 10.70 Mt | 1.02 g/t | 0.33 Moz | 26 Aug 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Resources | 10.70 Mt | 1.02 g/t | 0.33 Moz | 26 Aug 2026 | derived from 4 rows
| |
| — |
| Red Dog | Indicated | 0.35 Mt | 1.50 g/t | 0.02 Moz | 26 Aug 2026 | 2Unverified | notes (6)Ref: 2
QA notes:
|
| Red Dog | Inferred | 0.36 Mt | 1.20 g/t | 0.01 Moz | 26 Aug 2026 | 2Unverified | notes (6)Ref: 2
QA notes:
|
| Tin Dog | Indicated | 3.88 Mt | 1.00 g/t | 0.12 Moz | 26 Aug 2026 | 2Unverified | notes (6)Ref: 2
QA notes:
|
| Tin Dog | Inferred | 6.11 Mt | 1.00 g/t | 0.18 Moz | 26 Aug 2026 | 2Unverified | notes (6)Ref: 2
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; LATITUDE 66 LIMITED holds 80.0% of this project.