Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 32.31 Mt | 0.38 g/t | 0.39 Moz | 05 May 2026 |
| Inferred | 10.65 Mt | 0.30 g/t | 0.10 Moz | 05 May 2026 |
| Total Resources | 42.96 Mt | 0.36 g/t | 0.50 Moz | 05 May 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 32.31 Mt | 0.16% | 0.05 Mt Cu | 05 May 2026 |
| Inferred | 10.65 Mt | 0.08% | 0.01 Mt Cu | 05 May 2026 |
| Total Resources | 42.96 Mt | 0.16% | 0.06 Mt Cu | 05 May 2026 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Cu | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (% Cu) | Contained (Mt Cu) | |||||
| Indicated | 32.31 Mt | 0.38 g/t | 0.39 Moz | 0.16% | 0.05 Mt Cu | 05 May 2026 | 8Unverified | |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (1)Ref: 8
|
| Inferred | 10.65 Mt | 0.30 g/t | 0.10 Moz | 0.08% | 0.01 Mt Cu | 05 May 2026 | 8Unverified | notes (1)Ref: 8
|
| Total Resources | 42.96 Mt | 0.36 g/t | 0.50 Moz | 0.16% | 0.06 Mt Cu | 05 May 2026 | 8Unverified | notes (2)Ref: 8
QA notes:
|