Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Ni) | Contained (Mt Ni) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 0.39 Mt | 3.78% | 0.01 Mt Ni | 05 May 2026 |
| Total Resources | 0.78 Mt | 3.78% | 0.03 Mt Ni | 05 May 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Ni | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Ni) | Contained (Mt Ni) | |||||
| Inferred | 0.39 Mt | 3.78% | 0.01 Mt Ni | 05 May 2026 | 8Unverified | |
notes (1)Ref: 8
|
| Total Resources | 0.78 Mt | 3.78% | 0.03 Mt Ni | 05 May 2026 | Unverified | — |