Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 1.04 Mt | 1.19 g/t | 0.04 Moz | 20 Aug 2026 |
| Total Resources | 1.04 Mt | 1.19 g/t | 0.04 Moz | 20 Aug 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Inferred | 1.04 Mt | 1.19 g/t | 0.04 Moz | 20 Aug 2026 | 7Unverified | |
notes (5)Ref: 7
QA notes:
|
| Total | Total Resources | 1.04 Mt | 1.19 g/t | 0.04 Moz | 20 Aug 2026 | derived from 1 row
| — |
| 8-Mile supergene | Inferred | 0.14 Mt | 1.18 g/t | 0.01 Moz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Blackfriars | Inferred | 0.06 Mt | 1.19 g/t | 2.44 koz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Blackfriars South | Inferred | 0.03 Mt | 1.16 g/t | 0.96 koz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Highway | Inferred | 0.36 Mt | 0.89 g/t | 0.01 Moz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Hole 96 | Inferred | 0.05 Mt | 2.23 g/t | 3.63 koz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Marylebone | Inferred | 0.15 Mt | 1.73 g/t | 0.01 Moz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Marylebone Far North | Inferred | 0.05 Mt | 0.73 g/t | 1.25 koz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Marylebone North | Inferred | 0.04 Mt | 1.03 g/t | 1.19 koz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Pipeline | Inferred | 0.06 Mt | 1.42 g/t | 2.74 koz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Powerline | Inferred | 0.10 Mt | 1.09 g/t | 3.64 koz | 20 Aug 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; MIRAMAR RESOURCES LIMITED holds 80.0% of this project.