Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Fe) | Contained (Mt Fe) | As at |
|---|---|---|---|---|
| Measured | 2.00 Mt | 56.50% | 1.13 Mt Fe | 30 June 2025 |
| Indicated | 139.00 Mt | 57.30% | 79.65 Mt Fe | 30 June 2025 |
| Inferred | 20.00 Mt | 55.20% | 11.04 Mt Fe | 30 June 2025 |
| Total Resources | 110.30 Mt | 56.77% | 62.62 Mt Fe | 30 June 2025 |
| Proved | 2.00 Mt | 56.50% | 1.13 Mt Fe | 30 June 2025 |
| Probable | 48.70 Mt | 57.50% | 28.00 Mt Fe | 30 June 2025 |
| Total Reserves | 50.70 Mt | 57.50% | 29.15 Mt Fe | 30 June 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Fe | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Fe) | Contained (Mt Fe) | ||||||
| Total | Total Resources | 110.30 Mt | 56.77% | 62.62 Mt Fe | 30 June 2025 | 2Unverified | |
notes (4)Ref: 2
QA notes:
|
| in-situ | Indicated | 139.00 Mt | 57.30% | 79.65 Mt Fe | 30 June 2025 | 2Unverified | notes (4)Ref: 2
QA notes:
|
| in-situ | Inferred | 20.00 Mt | 55.20% | 11.04 Mt Fe | 30 June 2025 | 2Unverified | notes (4)Ref: 2
QA notes:
|
| stockpiles | Measured | 2.00 Mt | 56.50% | 1.13 Mt Fe | 30 June 2025 | 2Unverified | notes (4)Ref: 2
QA notes:
|
| Area | Category | Tonnes (Mt) | Fe | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Fe) | Contained (Mt Fe) | ||||||
| Total | Total Reserves | 50.70 Mt | 57.50% | 29.15 Mt Fe | 30 June 2025 | 6Unverified | notes (4)Ref: 6
QA notes:
|
| in-situ | Probable | 48.70 Mt | 57.50% | 28.00 Mt Fe | 30 June 2025 | 6Unverified | notes (4)Ref: 6
|
| stockpiles | Proved | 2.00 Mt | 56.50% | 1.13 Mt Fe | 30 June 2025 | 6Unverified | notes (4)Ref: 6
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.