Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 27.50 Mt | 0.23% | 0.06 Mt Cu | 04 Nov 2024 |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | 27.50 Mt | 0.23% | 0.06 Mt Cu | 04 Nov 2024 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Sn) | Contained (Mt Sn) | As at |
|---|---|---|---|---|
| Measured | 27.50 Mt | 0.43% | 0.12 Mt Sn | 04 Nov 2024 |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | 27.50 Mt | 0.43% | 0.12 Mt Sn | 04 Nov 2024 |
| Proved | — | — | — | — |
| Probable | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Cu | Sn | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Sn) | Contained (Mt Sn) | |||||
| Measured | 27.50 Mt | 0.23% | 0.06 Mt Cu | 0.43% | 0.12 Mt Sn | 04 Nov 2024 | 2Unverified | |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (4)Ref: 2
|
| Total Resources | 27.50 Mt | 0.23% | 0.06 Mt Cu | 0.43% | 0.12 Mt Sn | 04 Nov 2024 | 2Unverified | notes (4)Ref: 2
|
Figures are on a 100% project basis unless a row carries the attrib chip; METALS X LIMITED holds 50.0% of this project.