Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 1.55 Mt | 2.20 g/t | 0.11 Moz | 30 June 2026 |
| Inferred | 4.50 Mt | 2.46 g/t | 0.36 Moz | 30 June 2026 |
| Total Resources | 6.05 Mt | 2.39 g/t | 0.47 Moz | 30 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| OP | Indicated | 1.43 Mt | 2.02 g/t | 0.09 Moz | 30 June 2026 | 2Unverified | |
notes (6)Ref: 2
QA notes:
|
| OP | Inferred | 3.43 Mt | 1.86 g/t | 0.21 Moz | 30 June 2026 | 2Unverified | notes (4)Ref: 2
QA notes:
|
| OP | Total Resources | 4.86 Mt | 1.90 g/t | 0.30 Moz | 30 June 2026 | 2Unverified | notes (6)Ref: 2
QA notes:
|
| UG | Indicated | 0.12 Mt | 4.26 g/t | 0.02 Moz | 30 June 2026 | 2Unverified | notes (6)Ref: 2
QA notes:
|
| UG | Inferred | 1.07 Mt | 4.39 g/t | 0.15 Moz | 30 June 2026 | 2Unverified | notes (4)Ref: 2
QA notes:
|
| UG | Total Resources | 1.19 Mt | 4.38 g/t | 0.17 Moz | 30 June 2026 | 2Unverified | notes (6)Ref: 2
QA notes:
|