Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 1.00 Mt | 2.54 g/t | 0.08 Moz | 30 June 2026 |
| Inferred | 0.86 Mt | 1.85 g/t | 0.05 Moz | 30 June 2026 |
| Total Resources | 1.85 Mt | 2.22 g/t | 0.13 Moz | 30 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Indicated | 1.00 Mt | 2.54 g/t | 0.08 Moz | 30 June 2026 | 2Unverified | |
notes (6)Ref: 2
QA notes:
|
| Inferred | 0.86 Mt | 1.85 g/t | 0.05 Moz | 30 June 2026 | 2Unverified | notes (4)Ref: 2
QA notes:
|
| Total Resources | 1.85 Mt | 2.22 g/t | 0.13 Moz | 30 June 2026 | 2Unverified | notes (6)Ref: 2
QA notes:
|