Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 2.69 Mt | 1.17 g/t | 0.10 Moz | 14 July 2025 |
| Inferred | 4.60 Mt | 1.10 g/t | 0.16 Moz | 14 July 2025 |
| Total Resources | 7.29 Mt | 1.13 g/t | 0.26 Moz | 14 July 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Indicated | 2.69 Mt | 1.17 g/t | 0.10 Moz | 14 July 2025 | 2, 7Unverified | |
notes (5)Ref: 2, 7
QA notes:
|
| Inferred | 4.60 Mt | 1.10 g/t | 0.16 Moz | 14 July 2025 | 2, 7Unverified | notes (5)Ref: 2, 7
QA notes:
|
| Total Resources | 7.29 Mt | 1.13 g/t | 0.26 Moz | 14 July 2025 | 2, 7Unverified | notes (5)Ref: 2, 7
QA notes:
|