Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | 0.60 Mt | 0.90 g/t | 0.02 Moz | 01 Apr 2026 |
| Probable | — | — | — | — |
| Total Reserves | 0.60 Mt | 0.90 g/t | 0.02 Moz | 01 Apr 2026 |
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Reserves | 0.60 Mt | 0.90 g/t | 0.02 Moz | 01 Apr 2026 | derived from 1 row
| |
| — |
| Stockpiles | Proved | 0.60 Mt | 0.90 g/t | 0.02 Moz | 01 Apr 2026 | 76Unverified | notes (4)Ref: 76
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.