Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4.06 Mt | 2.20 g/t | 0.29 Moz | 01 Apr 2026 |
| Inferred | 3.21 Mt | 1.90 g/t | 0.20 Moz | 01 Apr 2026 |
| Total Resources | 4.90 Mt | 1.53 g/t | 0.24 Moz | 01 Apr 2026 |
| Proved | — | — | — | — |
| Probable | 1.18 Mt | 3.20 g/t | 0.12 Moz | 01 Apr 2026 |
| Total Reserves | 1.18 Mt | 3.20 g/t | 0.12 Moz | 01 Apr 2026 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Indicated | 4.06 Mt | 2.20 g/t | 0.29 Moz | 01 Apr 2026 | 4Unverified | |
notes (4)Ref: 4
QA notes:
|
| Total | Inferred | 3.21 Mt | 1.90 g/t | 0.20 Moz | 01 Apr 2026 | 4Unverified | notes (4)Ref: 4
QA notes:
|
| Total | Total Resources | 4.90 Mt | 1.53 g/t | 0.24 Moz | 01 Apr 2026 | 4Unverified | notes (4)Ref: 4
QA notes:
|
| Open Pit | Indicated | 0.22 Mt | 2.30 g/t | 0.02 Moz | 01 Apr 2026 | 4Unverified | notes (5)Ref: 4
QA notes:
|
| Open Pit | Inferred | 1 kt | 1.00 g/t | 0.03 koz | 01 Apr 2026 | 4Unverified | notes (4)Ref: 4
QA notes:
|
| Open Pit | Total Resources | 0.23 Mt † | 2.30 g/t † | 0.00 Moz | 01 Apr 2026 | 4Unverified | notes (5)Ref: 4
QA notes:
|
| Underground | Indicated | 3.83 Mt | 2.20 g/t | 0.27 Moz | 01 Apr 2026 | 4Unverified | notes (5)Ref: 4
QA notes:
|
| Underground | Inferred | 3.21 Mt | 1.90 g/t | 0.20 Moz | 01 Apr 2026 | 4Unverified | notes (5)Ref: 4
QA notes:
|
| Underground | Total Resources | 4.68 Mt | 1.50 g/t | 0.23 Moz | 01 Apr 2026 | 4Unverified | notes (5)Ref: 4
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Probable | 1.18 Mt | 3.20 g/t | 0.12 Moz | 01 Apr 2026 | 57Unverified | notes (5)Ref: 57
QA notes:
|
| Total | Total Reserves | 1.18 Mt | 3.20 g/t | 0.12 Moz | 01 Apr 2026 | 57Unverified | notes (5) |
| Low Grade | Probable | 0.16 Mt | 1.10 g/t | 0.01 Moz | 01 Apr 2026 | 57Unverified | notes (5)Ref: 57 |
| Low Grade | Total Reserves | 0.16 Mt | 1.10 g/t | 0.01 Moz | 01 Apr 2026 | 57Unverified | notes (5) |
| Open Pit | Probable | 0.20 Mt | 2.10 g/t | 0.01 Moz | 01 Apr 2026 | 6Unverified | notes (5)Ref: 6 |
| Open Pit | Total Reserves | 0.20 Mt | 2.10 g/t | 0.01 Moz | 01 Apr 2026 | 6Unverified | notes (5) |
| Underground | Probable | 0.83 Mt | 3.80 g/t | 0.10 Moz | 01 Apr 2026 | 6Unverified | notes (5) |
| Underground | Total Reserves | 0.83 Mt | 3.80 g/t | 0.10 Moz | 01 Apr 2026 | 6Unverified | notes (4) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
† Total-row tonnes/grade as published (not net): the reserve statement prints no tonnage to net out, so only the contained figure honours the Resources treatment there.