Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 2.83 Mt | 1.97 g/t | 0.18 Moz | 07 July 2026 |
| Inferred | 8.60 Mt | 2.44 g/t | 0.68 Moz | 07 July 2026 |
| Total Resources | 11.43 Mt | 2.32 g/t | 0.86 Moz | 07 July 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Resources | 11.43 Mt | 2.32 g/t | 0.86 Moz | 07 July 2026 | derived from 27 rows
| |
| — |
| Anchor | Inferred | 0.09 Mt | 2.60 g/t | 0.01 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Bollard | Indicated | 0.15 Mt | 1.90 g/t | 0.01 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Bollard | Inferred | 0.53 Mt | 2.20 g/t | 0.04 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Bollard Pit | Indicated | 0.15 Mt | 1.90 g/t | 0.01 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Bollard Pit | Inferred | 0.53 Mt | 2.20 g/t | 0.04 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Bottle Dump | Indicated | 0.15 Mt | 3.40 g/t | 0.02 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Bottle Dump | Inferred | 0.76 Mt | 2.20 g/t | 0.05 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Bottle Dump Pit | Indicated | 0.15 Mt | 3.40 g/t | 0.02 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Bottle Dump Pit | Inferred | 0.76 Mt | 2.20 g/t | 0.05 Moz | 15 Feb 2024 | 10Unverified | notes (3)Ref: 10
QA notes:
|
| Cable – Open Pit | Indicated | 1.65 Mt | 1.60 g/t | 0.09 Moz | 07 July 2026 | 7Unverified | notes (4)Ref: 7
QA notes:
|
| Cable – Open Pit | Inferred | 1.09 Mt | 2.00 g/t | 0.07 Moz | 07 July 2026 | 7Unverified | notes (4)Ref: 7
QA notes:
|
| Cable Pit | Indicated | 0.40 Mt | 2.30 g/t | 0.03 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Cable Pit | Inferred | 1.30 Mt | 2.20 g/t | 0.09 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Highway Zone – Open Pit | Inferred | 0.44 Mt | 2.30 g/t | 0.03 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Highway Zone – Underground | Inferred | 0.35 Mt | 5.80 g/t | 0.07 Moz | 07 July 2026 | 34Unverified | notes (3)Ref: 34
QA notes:
|
| Highway Zone Pit | Inferred | 0.44 Mt | 2.30 g/t | 0.03 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Highway Zone UG | Inferred | 0.35 Mt | 5.80 g/t | 0.07 Moz | 15 Feb 2024 | 10Unverified | notes (3)Ref: 10
QA notes:
|
| Kohinoor – Open Pit | Inferred | 0.16 Mt | 2.40 g/t | 0.01 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Kohinoor – Underground | Inferred | 0.03 Mt | 9.10 g/t | 0.01 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Kohinoor Pit | Inferred | 0.16 Mt | 2.40 g/t | 0.01 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Kohinoor UG | Inferred | 0.03 Mt | 9.10 g/t | 0.01 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Lucknow | Inferred | 0.22 Mt | 1.30 g/t | 0.01 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Lucknow Pit | Inferred | 0.22 Mt | 1.30 g/t | 0.01 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Maybelle | Indicated | 0.09 Mt | 2.30 g/t | 0.01 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Maybelle | Inferred | 0.57 Mt | 1.80 g/t | 0.03 Moz | 07 July 2026 | 34Unverified | notes (4)Ref: 34
QA notes:
|
| Maybelle Pit | Indicated | 0.09 Mt | 2.30 g/t | 0.01 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
| Maybelle Pit | Inferred | 0.57 Mt | 1.80 g/t | 0.03 Moz | 15 Feb 2024 | 10Unverified | notes (4)Ref: 10
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; ODYSSEY GOLD LTD holds 80.0% of this project.