Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | 20.00 Mt | 1.32% Li2O | 0.74 Mt LCE | 31 Mar 2025 |
| Indicated | 356.00 Mt | 1.29% Li2O | 11.38 Mt LCE | 31 Mar 2025 |
| Inferred | 70.00 Mt | 1.25% Li2O | 2.23 Mt LCE | 31 Mar 2025 |
| Total Resources | 454.00 Mt | 1.28% Li2O | 14.62 Mt LCE | 31 Mar 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Measured | 20.00 Mt | 1.32% Li2O | 0.74 Mt LCE | 31 Mar 2025 | 2Unverified | |
notes (3)Ref: 2
QA notes:
|
| Total | Indicated | 356.00 Mt | 1.29% Li2O | 11.38 Mt LCE | 31 Mar 2025 | 2Unverified | notes (3)Ref: 2
QA notes:
|
| Total | Inferred | 70.00 Mt | 1.25% Li2O | 2.23 Mt LCE | 31 Mar 2025 | 2Unverified | notes (3)Ref: 2
QA notes:
|
| Total | Total Resources | 454.00 Mt | 1.28% Li2O | 14.62 Mt LCE | 31 Mar 2025 | Unverified | — |
| Central | Measured | 10.00 Mt | 1.43% Li2O | 0.25 Mt LCE | 31 Mar 2025 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Central | Indicated | 255.00 Mt | 1.37% Li2O | 8.66 Mt LCE | 31 Mar 2025 | 5Unverified | notes (2)Ref: 5
|
| Central | Inferred | 44.00 Mt | 1.36% Li2O | 1.48 Mt LCE | 31 Mar 2025 | 5Unverified | notes (2)Ref: 5
|
| North | Measured | 1.00 Mt | 1.41% Li2O | 0.03 Mt LCE | 31 Mar 2025 | 5Unverified | notes (2)Ref: 5
|
| North | Indicated | 12.00 Mt | 1.26% Li2O | 0.25 Mt LCE | 31 Mar 2025 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| North | Inferred | 3.00 Mt | 1.14% Li2O | 0.08 Mt LCE | 31 Mar 2025 | 5Unverified | notes (2)Ref: 5
|
| South | Measured | 8.00 Mt | 1.21% Li2O | 0.25 Mt LCE | 31 Mar 2025 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| South | Indicated | 82.00 Mt | 1.06% Li2O | 2.23 Mt LCE | 31 Mar 2025 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| South | Inferred | 23.00 Mt | 1.06% Li2O | 0.49 Mt LCE | 31 Mar 2025 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Stockpiles | Measured | 1.00 Mt | 1.10% Li2O | 0.03 Mt LCE | 31 Mar 2025 | 2Unverified | notes (2)Ref: 2
|
| Stockpiles | Indicated | 7.00 Mt | 0.93% Li2O | 0.25 Mt LCE | 31 Mar 2025 | 2Unverified | notes (3)Ref: 2
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.