Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4.10 Mt | 1.60 g/t | 0.21 Moz | 16 Mar 2026 |
| Inferred | 5.70 Mt | 1.30 g/t | 0.24 Moz | 16 Mar 2026 |
| Total Resources | 9.80 Mt | 1.40 g/t | 0.45 Moz | 16 Mar 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Indicated | 4.10 Mt | 1.60 g/t | 0.21 Moz | 16 Mar 2026 | 8Unverified | |
notes (3)Ref: 8
QA notes:
|
| Total | Inferred | 5.70 Mt | 1.30 g/t | 0.24 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Total | Total Resources | 9.80 Mt | 1.40 g/t | 0.45 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Fresh | Indicated | 1.80 Mt | 1.60 g/t | 0.09 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Fresh | Inferred | 4.40 Mt | 1.30 g/t | 0.19 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Fresh | Total Resources | 6.10 Mt | 1.40 g/t | 0.28 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Oxide | Indicated | 1.20 Mt | 1.60 g/t | 0.06 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Oxide | Inferred | 0.60 Mt | 1.30 g/t | 0.03 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Oxide | Total Resources | 1.80 Mt | 1.50 g/t | 0.09 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Oxidised | Indicated | 0.64 Mt | 1.50 g/t | 0.03 Moz | 02 Apr 2025 | 5Unverified | notes (3)Ref: 5
QA notes:
|
| Oxidised | Inferred | 1.15 Mt | 1.20 g/t | 0.05 Moz | 02 Apr 2025 | 5Unverified | notes (4)Ref: 5
QA notes:
|
| Transitional | Indicated | 1.20 Mt | 1.60 g/t | 0.06 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Transitional | Inferred | 0.70 Mt | 1.20 g/t | 0.03 Moz | 16 Mar 2026 | 8Unverified | notes (4)Ref: 8
QA notes:
|
| Transitional | Total Resources | 1.90 Mt | 1.50 g/t | 0.09 Moz | 16 Mar 2026 | 8Unverified | notes (3)Ref: 8
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.