Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 85.00 Mt | 1.76% Li2O | 3.70 Mt LCE | 31 Dec 2025 |
| Inferred | 58.00 Mt | 1.87% Li2O | 2.68 Mt LCE | 31 Dec 2025 |
| Total Resources | 143.00 Mt | 1.80% Li2O | 6.38 Mt LCE | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | |||||
| Indicated | 85.00 Mt | 1.76% Li2O | 3.70 Mt LCE | 31 Dec 2025 | Mineral Resources — Lithium (hard rock) tableUnverified | |
notes (3)Ref: Mineral Resources — Lithium (hard rock) table
QA notes:
|
| Inferred | 58.00 Mt | 1.87% Li2O | 2.68 Mt LCE | 31 Dec 2025 | Mineral Resources — Lithium (hard rock) tableUnverified | notes (3)Ref: Mineral Resources — Lithium (hard rock) table
QA notes:
|
| Total Resources | 143.00 Mt | 1.80% Li2O | 6.38 Mt LCE | 31 Dec 2025 | derived from 2 rows | — |