These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 23.00 Mt | 1.60 g/t | 1.20 Moz | 30 June 2026 |
| Inferred | 11.00 Mt | 1.60 g/t | 0.56 Moz | 30 June 2026 |
| Total Resources | 34.00 Mt | 1.60 g/t | 1.80 Moz | 30 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Indicated | 23.00 Mt | 1.60 g/t | 1.20 Moz | 30 June 2026 | 4Unverified | |
notes (5)Ref: 4
QA notes:
|
| Total | Inferred | 11.00 Mt | 1.60 g/t | 0.56 Moz | 30 June 2026 | 4Unverified | notes (5)Ref: 4
QA notes:
|
| Total | Total Resources | 34.00 Mt | 1.60 g/t | 1.80 Moz | 30 June 2026 | 4Unverified | notes (5)Ref: 4
QA notes:
|
| Bombora Open Pit | Indicated | 16.00 Mt | 1.50 g/t | 0.74 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Bombora Open Pit | Inferred | 3.10 Mt | 1.30 g/t | 0.13 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Bombora Open Pit | Total Resources | 19.00 Mt | 1.40 g/t | 0.87 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Bombora Underground | Indicated | 4.30 Mt | 2.50 g/t | 0.35 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Bombora Underground | Inferred | 4.70 Mt | 2.10 g/t | 0.32 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Bombora Underground | Total Resources | 9.00 Mt | 2.30 g/t | 0.67 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Claypan | Inferred | 2.00 Mt | 1.10 g/t | 0.07 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Claypan | Total Resources | 2.00 Mt | 1.10 g/t | 0.07 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Kopai-Crescent | Indicated | 2.90 Mt | 1.20 g/t | 0.11 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Kopai-Crescent | Inferred | 1.50 Mt | 0.90 g/t | 0.05 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
| Kopai-Crescent | Total Resources | 4.40 Mt | 1.10 g/t | 0.15 Moz | 30 June 2026 | 33Unverified | notes (5)Ref: 33
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.