Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 40.00 Mt | 0.38 g/t | 0.49 Moz | 24 Nov 2025 |
| Inferred | 190.00 Mt | 0.32 g/t | 1.95 Moz | 24 Nov 2025 |
| Total Resources | 230.00 Mt | 0.33 g/t | 2.44 Moz | 24 Nov 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 40.00 Mt | 1.26 g/t | 1.62 Moz | 24 Nov 2025 |
| Inferred | 190.00 Mt | 1.14 g/t | 6.96 Moz | 24 Nov 2025 |
| Total Resources | 230.00 Mt | 1.16 g/t | 8.58 Moz | 24 Nov 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 40.00 Mt | 0.10% | 0.04 Mt Cu | 24 Nov 2025 |
| Inferred | 190.00 Mt | 0.10% | 0.19 Mt Cu | 24 Nov 2025 |
| Total Resources | 230.00 Mt | 0.10% | 0.23 Mt Cu | 24 Nov 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | |||||
| Indicated | 40.00 Mt | 0.38 g/t | 0.49 Moz | 1.26 g/t | 1.62 Moz | 0.10% | 0.04 Mt Cu | 24 Nov 2025 | ||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (8)Ref: page 10
QA notes:
|
| Inferred | 190.00 Mt | 0.32 g/t | 1.95 Moz | 1.14 g/t | 6.96 Moz | 0.10% | 0.19 Mt Cu | 24 Nov 2025 | page 10Unverified | notes (6)Ref: page 10
QA notes:
|
| Total Resources | 230.00 Mt | 0.33 g/t | 2.44 Moz | 1.16 g/t | 8.58 Moz | 0.10% | 0.23 Mt Cu | 24 Nov 2025 | Unverified | — |
Figures are on a 100% project basis unless a row carries the attrib chip; SUNSTONE METALS LTD holds 87.5% of this project.