Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 31.80 Mt | 1.10 g/t | 1.12 Moz | 04 Aug 2025 |
| Inferred | 19.50 Mt | 1.11 g/t | 0.69 Moz | 04 Aug 2025 |
| Total Resources | 51.20 Mt | 1.10 g/t | 1.82 Moz | 04 Aug 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Optimised Open Pit | Indicated | 31.80 Mt | 1.10 g/t | 1.12 Moz | 04 Aug 2025 | 9Unverified | |
notes (2)Ref: 9
|
| Optimised Open Pit | Inferred | 19.50 Mt | 1.11 g/t | 0.69 Moz | 04 Aug 2025 | 9Unverified | notes (2)Ref: 9
|
| Optimised Open Pit | Total Resources | 51.20 Mt | 1.10 g/t | 1.82 Moz | 04 Aug 2025 | 9Unverified | notes (2)Ref: 9
|
Figures are on a 100% project basis unless a row carries the attrib chip; TESORO GOLD LTD holds 95.4% of this project.