These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 8.89 Mt | 3.02 g/t | 0.86 Moz | 30 June 2026 |
| Indicated | 5.34 Mt | 2.46 g/t | 0.42 Moz | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 7.63 Mt | 2.75 g/t | 0.68 Moz | 30 June 2026 |
| Inferred | 6.98 Mt | 2.43 g/t | 0.55 Moz | 30 June 2026 |
| Total Resources | 14.46 Mt | 2.71 g/t | 1.26 Moz | 30 June 2026 |
| Proved | 4.02 Mt | 2.82 g/t | 0.36 Moz | 30 June 2026 |
| Probable | 2.73 Mt | 2.40 g/t | 0.21 Moz | 30 June 2026 |
| Total Reserves | 6.75 Mt | 2.64 g/t | 0.57 Moz | 30 June 2026 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Resources | 14.46 Mt | 2.71 g/t | 1.26 Moz | 30 June 2026 | derived from 6 rows | |
| — |
| Starlight UG | Measured | 4.99 Mt | 3.01 g/t | 0.48 Moz | 30 June 2026 | 4Unverified | notes (4)Ref: 4
QA notes:
|
| Starlight UG | Indicated | 2.64 Mt | 2.26 g/t | 0.19 Moz | 30 June 2026 | 4Unverified | notes (4)Ref: 4
QA notes:
|
| Starlight UG | M&I = Measured + Indicated (overlaps both) | 7.63 Mt | 2.75 g/t | 0.68 Moz | 30 June 2026 | 4Unverified | notes (4)Ref: 4
QA notes:
|
| Starlight UG | Inferred | 4.35 Mt | 2.08 g/t | 0.29 Moz | 30 June 2026 | 4Unverified | notes (4)Ref: 4
QA notes:
|
| UG | Measured | 3.90 Mt | 3.04 g/t | 0.38 Moz | 30 June 2025 | 4Unverified | notes (2)Ref: 4
|
| UG | Indicated | 2.70 Mt | 2.65 g/t | 0.23 Moz | 30 June 2025 | 4Unverified | notes (2)Ref: 4
|
| UG | Inferred | 2.63 Mt | 3.02 g/t | 0.26 Moz | 30 June 2025 | 4Unverified | notes (2)Ref: 4
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Starlight UG | Proved | 2.48 Mt | 2.82 g/t | 0.23 Moz | 30 June 2026 | 23Unverified | notes (4)Ref: 23
QA notes:
|
| Starlight UG | Probable | 1.29 Mt | 2.39 g/t | 0.10 Moz | 30 June 2026 | 23Unverified | notes (4) |
| Starlight UG | Total Reserves | 3.77 Mt | 2.67 g/t | 0.32 Moz | 30 June 2026 | 23Unverified | notes (4) |
| UG | Proved | 1.53 Mt | 2.81 g/t | 0.14 Moz | 30 June 2025 | 23Unverified | notes (2)Ref: 23
|
| UG | Probable | 1.44 Mt | 2.41 g/t | 0.11 Moz | 30 June 2025 | 23Unverified | notes (2)Ref: 23
|
| UG | Total Reserves | 2.98 Mt | 2.61 g/t | 0.25 Moz | 30 June 2025 | 23Unverified | notes (2)Ref: 23
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.