Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 89.90 Mt | 0.49% | 0.44 Mt Cu | 31 Dec 2025 |
| Total Resources | 179.80 Mt | 0.49% | 0.88 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Cu | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Total Resources | 179.80 Mt | 0.49% | 0.88 Mt Cu | 31 Dec 2025 | derived from 2 rows
| |
| — |
| Oxides | Inferred | 89.90 Mt | 0.49% | 0.44 Mt Cu | 31 Dec 2025 | 256Unverified | notes (3)Source: Antofagasta plc - Annual Report and Financial Statements 2025, incl. Ore Reserves and Mineral Resources as at 31 Dec 2025 (subsidiaries 100% basis; Zaldivar 50%) · published 26 Mar 2026 Ref: 256
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; Antofagasta plc holds 51.0% of this project.