Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 9.17 Mt | 91.00 g/t | 26.75 Moz | 31 Dec 2025 |
| Total Resources | 9.17 Mt | 91.00 g/t | 26.75 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 9.17 Mt | 1.12% | 0.10 Mt Zn | 31 Dec 2025 |
| Total Resources | 9.17 Mt | 1.12% | 0.10 Mt Zn | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — |
| Category | Tonnes (Mt) | Grade (% Pb) | Contained (Mt Pb) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 9.17 Mt | 1.29% | 0.12 Mt Pb | 31 Dec 2025 |
| Total Resources | 9.17 Mt | 1.29% | 0.12 Mt Pb | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Ag | Zn | Pb | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | |||||
| Inferred | 9.17 Mt | 91.00 g/t | 26.75 Moz | 1.12% | 0.10 Mt Zn | 1.29% | 0.12 Mt Pb | 31 Dec 2025 | ||
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (3)Source: Fresnillo plc - Annual Report and Accounts 2025, incl. Mineral Resources and Ore Reserves tables as at 31 Dec 2025 · published 17 Apr 2026 Ref: p.287 - Consolidated audited mineral resource statement of exploration projects and prospects
QA notes:
|
| Total Resources | 9.17 Mt | 91.00 g/t | 26.75 Moz | 1.12% | 0.10 Mt Zn | 1.29% | 0.12 Mt Pb | 31 Dec 2025 | derived from 1 row | — |