| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 271.00 Mt | 3.83% | 10.38 Mt Cu | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 271.00 Mt | 3.83% | 10.38 Mt Cu | 31 Dec 2025 |
| Inferred | 35.00 Mt | 3.28% | 1.15 Mt Cu | 31 Dec 2025 |
| Total Resources | 53.80 Mt | 2.30% | 1.24 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | 137.00 Mt | 3.83% | 5.25 Mt Cu | 31 Dec 2025 |
| Total Reserves | 137.00 Mt | 3.83% | 5.25 Mt Cu | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| Category | Tonnes (Mt) | Grade (% Co) | Contained (Mt Co) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 271.00 Mt | 0.59% | 1.60 Mt Co | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 271.00 Mt | 0.59% | 1.60 Mt Co | 31 Dec 2025 |
| Inferred | 35.00 Mt | 0.63% | 0.22 Mt Co | 31 Dec 2025 |
| Total Resources | 53.80 Mt |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Cu | Co | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Co) | Contained (Mt Co) | ||||||
| Total | Indicated | 271.00 Mt | 3.83% | 10.38 Mt Cu | 0.59% | 1.60 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | |
| 1.47% |
| 0.79 Mt Co |
| 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | 137.00 Mt | 0.42% | 0.58 Mt Co | 31 Dec 2025 |
| Total Reserves | 137.00 Mt | 0.42% | 0.58 Mt Co | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Total | M&I = Measured + Indicated (overlaps both) | 271.00 Mt | 3.83% | 10.38 Mt Cu | 0.59% | 1.60 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Total | Inferred | 35.00 Mt | 3.28% | 1.15 Mt Cu | 0.63% | 0.22 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Total | Total Resources | 53.80 Mt | 2.30% | 1.24 Mt Cu | 1.47% | 0.79 Mt Co | 31 Dec 2025 | derived from 3 rows
| — |
| Opencut operations | Indicated | 133.00 Mt | 4.42% | 5.88 Mt Cu | 0.49% | 0.65 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Opencut operations | M&I = Measured + Indicated (overlaps both) | 133.00 Mt | 4.42% | 5.88 Mt Cu | 0.49% | 0.65 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Stockpiles | Indicated | 21.70 Mt | 0.95% | 0.21 Mt Cu | 0.55% | 0.12 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Stockpiles | M&I = Measured + Indicated (overlaps both) | 21.70 Mt | 0.95% | 0.21 Mt Cu | 0.55% | 0.12 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Underground operations | Indicated | 116.00 Mt | 3.70% | 4.29 Mt Cu | 0.72% | 0.84 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (5)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Underground operations | M&I = Measured + Indicated (overlaps both) | 116.00 Mt | 3.70% | 4.29 Mt Cu | 0.72% | 0.84 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (5)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Underground operations | Inferred | 35.00 Mt | 3.28% | 1.15 Mt Cu | 0.63% | 0.22 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (5)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Area | Category | Tonnes (Mt) | Cu | Co | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Co) | Contained (Mt Co) | ||||||
| Total | Probable | 137.00 Mt | 3.83% | 5.25 Mt Cu | 0.42% | 0.58 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (3)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.9 - COPPER: African Copper — KCC
QA notes:
|
| Total | Total Reserves | 137.00 Mt | 3.83% | 5.25 Mt Cu | 0.42% | 0.58 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (3) |
| Opencut operations | Probable | 111.00 Mt | 4.44% | 4.93 Mt Cu | 0.39% | 0.43 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (3) |
| Opencut operations | Total Reserves | 111.00 Mt | 4.44% | 4.93 Mt Cu | 0.39% | 0.43 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (3) |
| Stockpiles | Probable | 21.70 Mt | 0.95% | 0.21 Mt Cu | 0.55% | 0.12 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (3) |
| Stockpiles | Total Reserves | 21.70 Mt | 0.95% | 0.21 Mt Cu | 0.55% | 0.12 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (3) |
| Underground operations | Probable | 4.20 Mt | 2.72% | 0.11 Mt Cu | 0.52% | 0.02 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (4) |
| Underground operations | Total Reserves | 4.20 Mt | 2.72% | 0.11 Mt Cu | 0.52% | 0.02 Mt Co | 31 Dec 2025 | p.9 - COPPER: African Copper — KCCManual entry | notes (4) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.