These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 96.00 Mt | 41.00 g/t | 126.55 Moz | 31 Dec 2025 |
| Indicated | 29.60 Mt | 49.00 g/t | 46.63 Moz | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 125.00 Mt | 43.00 g/t | 172.81 Moz | 31 Dec 2025 |
| Inferred | 2.00 Mt | 72.00 g/t | 4.63 Moz | 31 Dec 2025 |
| Total Resources | 127.60 Mt † | 43.34 g/t † | 0.00 Moz | 31 Dec 2025 |
| Proved | 61.00 Mt | 44.00 g/t | 86.29 Moz | 31 Dec 2025 |
| Probable | 10.20 Mt | 28.00 g/t | 9.18 Moz | 31 Dec 2025 |
| Total Reserves | 71.00 Mt | 42.00 g/t | 95.87 Moz | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
† Tonnes and grade as published (not net): the reserve statement prints no tonnage to net out, so only Contained honours the Resources treatment on this row.
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | 96.00 Mt | 9.19% | 8.82 Mt Zn | 31 Dec 2025 |
| Indicated | 29.60 Mt | 10.03% | 2.97 Mt Zn | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 125.00 Mt | 9.39% | 11.74 Mt Zn | 31 Dec 2025 |
| Inferred | 2.00 Mt | 9.71% | 0.19 Mt Zn | 31 Dec 2025 |
| Total Resources |
| Category | Tonnes (Mt) | Grade (% Pb) | Contained (Mt Pb) | As at |
|---|---|---|---|---|
| Measured | 96.00 Mt | 4.05% | 3.89 Mt Pb | 31 Dec 2025 |
| Indicated | 29.60 Mt | 4.59% | 1.36 Mt Pb | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 125.00 Mt | 4.18% | 5.23 Mt Pb | 31 Dec 2025 |
| Inferred | 2.00 Mt | 6.49% | 0.13 Mt Pb | 31 Dec 2025 |
| Total Resources |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Ag | Zn | Pb | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | ||||||
| Total | Measured | 96.00 Mt | 41.00 g/t | 126.55 Moz | 9.19% | 8.82 Mt Zn | 4.05% | ||||
| 9.39% † |
| 0.00 Mt Zn |
| 31 Dec 2025 |
| Proved | 61.00 Mt | 9.39% | 5.73 Mt Zn | 31 Dec 2025 |
| Probable | 10.20 Mt | 5.59% | 0.57 Mt Zn | 31 Dec 2025 |
| Total Reserves | 71.00 Mt | 8.85% | 6.28 Mt Zn | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
† Tonnes and grade as published (not net): the reserve statement prints no tonnage to net out, so only Contained honours the Resources treatment on this row.
| 4.21% † |
| 0.00 Mt Pb |
| 31 Dec 2025 |
| Proved | 61.00 Mt | 4.41% | 2.69 Mt Pb | 31 Dec 2025 |
| Probable | 10.20 Mt | 2.62% | 0.27 Mt Pb | 31 Dec 2025 |
| Total Reserves | 71.00 Mt | 4.15% | 2.95 Mt Pb | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
† Tonnes and grade as published (not net): the reserve statement prints no tonnage to net out, so only Contained honours the Resources treatment on this row.
| 31 Dec 2025 |
| p.24 - ZINC: AustraliaManual entry |
notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Total | Indicated | 29.60 Mt | 49.00 g/t | 46.63 Moz | 10.03% | 2.97 Mt Zn | 4.59% | 1.36 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Total | M&I = Measured + Indicated (overlaps both) | 125.00 Mt | 43.00 g/t | 172.81 Moz | 9.39% | 11.74 Mt Zn | 4.18% | 5.23 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Total | Inferred | 2.00 Mt | 72.00 g/t | 4.63 Moz | 9.71% | 0.19 Mt Zn | 6.49% | 0.13 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Total | Total Resources | 127.60 Mt † | 43.34 g/t † | 0.00 Moz | 9.39% † | 0.00 Mt Zn | 4.21% † | 0.00 Mt Pb | 31 Dec 2025 | derived from 3 rows
| — |
| Open Cut | Measured | 96.00 Mt | 41.00 g/t | 126.55 Moz | 9.19% | 8.82 Mt Zn | 4.05% | 3.89 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Open Cut | Indicated | 21.30 Mt | 45.00 g/t | 30.82 Moz | 8.41% | 1.79 Mt Zn | 4.22% | 0.90 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Open Cut | M&I = Measured + Indicated (overlaps both) | 117.00 Mt | 42.00 g/t | 157.99 Moz | 9.05% | 10.59 Mt Zn | 4.08% | 4.77 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Open Cut | Inferred | 2.00 Mt | 72.00 g/t | 4.63 Moz | 9.71% | 0.19 Mt Zn | 6.49% | 0.13 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Woyzbun South Zone | Indicated | 8.30 Mt | 58.00 g/t | 15.48 Moz | 14.19% | 1.18 Mt Zn | 5.55% | 0.46 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Woyzbun South Zone | M&I = Measured + Indicated (overlaps both) | 8.30 Mt | 58.00 g/t | 15.48 Moz | 14.19% | 1.18 Mt Zn | 5.55% | 0.46 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Area | Category | Tonnes (Mt) | Ag | Zn | Pb | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | ||||||
| Total | Proved | 61.00 Mt | 44.00 g/t | 86.29 Moz | 9.39% | 5.73 Mt Zn | 4.41% | 2.69 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (3)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.24 - ZINC: Australia
QA notes:
|
| Total | Probable | 10.20 Mt | 28.00 g/t | 9.18 Moz | 5.59% | 0.57 Mt Zn | 2.62% | 0.27 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | |
| Total | Total Reserves | 71.00 Mt | 42.00 g/t | 95.87 Moz | 8.85% | 6.28 Mt Zn | 4.15% | 2.95 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | |
| Open Cut | Proved | 61.00 Mt | 44.00 g/t | 86.29 Moz | 9.39% | 5.73 Mt Zn | 4.41% | 2.69 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (3) |
| Open Cut | Probable | 10.20 Mt | 28.00 g/t | 9.18 Moz | 5.59% | 0.57 Mt Zn | 2.62% | 0.27 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | notes (3) |
| Open Cut | Total Reserves | 71.00 Mt | 42.00 g/t | 95.87 Moz | 8.85% | 6.28 Mt Zn | 4.15% | 2.95 Mt Pb | 31 Dec 2025 | p.24 - ZINC: AustraliaManual entry | |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
† Total-row tonnes/grade as published (not net): the reserve statement prints no tonnage to net out, so only the contained figure honours the Resources treatment there.