Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 217.00 Mt | 1.79% | 3.88 Mt Cu | 31 Dec 2025 |
| Indicated | 93.00 Mt | 1.67% | 1.55 Mt Cu | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 310.00 Mt | 1.75% | 5.43 Mt Cu | 31 Dec 2025 |
| Inferred | 25.00 Mt | 2.33% | 0.58 Mt Cu | 31 Dec 2025 |
| Total Resources | 149.80 Mt | 1.73% | 2.59 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | 107.00 Mt | 1.75% | 1.87 Mt Cu | 31 Dec 2025 |
| Total Reserves | 107.00 Mt | 1.75% | 1.87 Mt Cu | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| Category | Tonnes (Mt) | Grade (% Co) | Contained (Mt Co) | As at |
|---|---|---|---|---|
| Measured | 217.00 Mt | 0.58% | 1.26 Mt Co | 31 Dec 2025 |
| Indicated | 93.00 Mt | 0.69% | 0.64 Mt Co | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 310.00 Mt | 0.61% | 1.89 Mt Co | 31 Dec 2025 |
| Inferred | 25.00 Mt | 0.68% | 0.17 Mt Co | 31 Dec 2025 |
| Total Resources |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Cu | Co | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Co) | Contained (Mt Co) | ||||||
| Total | Measured | 217.00 Mt | 1.79% | 3.88 Mt Cu | 0.58% | 1.26 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | |
| 0.55% |
| 0.83 Mt Co |
| 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | 107.00 Mt | 0.64% | 0.68 Mt Co | 31 Dec 2025 |
| Total Reserves | 107.00 Mt | 0.64% | 0.68 Mt Co | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Total | Indicated | 93.00 Mt | 1.67% | 1.55 Mt Cu | 0.69% | 0.64 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Total | M&I = Measured + Indicated (overlaps both) | 310.00 Mt | 1.75% | 5.43 Mt Cu | 0.61% | 1.89 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Total | Inferred | 25.00 Mt | 2.33% | 0.58 Mt Cu | 0.68% | 0.17 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Total | Total Resources | 149.80 Mt | 1.73% | 2.59 Mt Cu | 0.55% | 0.83 Mt Co | 31 Dec 2025 | derived from 4 rows
| — |
| Opencut operations | Measured | 186.00 Mt | 1.87% | 3.48 Mt Cu | 0.59% | 1.10 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Opencut operations | Indicated | 87.00 Mt | 1.61% | 1.40 Mt Cu | 0.67% | 0.58 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Opencut operations | M&I = Measured + Indicated (overlaps both) | 273.00 Mt | 1.79% | 4.89 Mt Cu | 0.61% | 1.67 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Opencut operations | Inferred | 17.00 Mt | 1.94% | 0.33 Mt Cu | 0.62% | 0.11 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Stockpiles | Measured | 28.60 Mt | 1.11% | 0.32 Mt Cu | 0.45% | 0.13 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Stockpiles | M&I = Measured + Indicated (overlaps both) | 28.60 Mt | 1.11% | 0.32 Mt Cu | 0.45% | 0.13 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Underground operations | Measured | 2.10 Mt | 3.47% | 0.07 Mt Cu | 0.95% | 0.02 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Underground operations | Indicated | 6.00 Mt | 2.50% | 0.15 Mt Cu | 0.94% | 0.06 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Underground operations | M&I = Measured + Indicated (overlaps both) | 8.10 Mt | 2.76% | 0.22 Mt Cu | 0.94% | 0.08 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Underground operations | Inferred | 8.00 Mt | 3.16% | 0.25 Mt Cu | 0.80% | 0.06 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Area | Category | Tonnes (Mt) | Cu | Co | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Co) | Contained (Mt Co) | ||||||
| Total | Probable | 107.00 Mt | 1.75% | 1.87 Mt Cu | 0.64% | 0.68 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (3)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.10 - COPPER: African Copper — Mutanda
QA notes:
|
| Total | Total Reserves | 107.00 Mt | 1.75% | 1.87 Mt Cu | 0.64% | 0.68 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (3) |
| Opencut operations | Probable | 88.00 Mt | 1.88% | 1.65 Mt Cu | 0.69% | 0.61 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (3) |
| Opencut operations | Total Reserves | 88.00 Mt | 1.88% | 1.65 Mt Cu | 0.69% | 0.61 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (3) |
| Stockpiles | Probable | 18.80 Mt | 1.15% | 0.22 Mt Cu | 0.43% | 0.08 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (3) |
| Stockpiles | Total Reserves | 18.80 Mt | 1.15% | 0.22 Mt Cu | 0.43% | 0.08 Mt Co | 31 Dec 2025 | p.10 - COPPER: African Copper — MutandaManual entry | notes (3) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.