Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 45.00 Mt | 7.21% | 3.24 Mt Zn | 31 Dec 2025 |
| Total Resources | 45.00 Mt | 7.21% | 3.24 Mt Zn | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Pb) | Contained (Mt Pb) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 45.00 Mt | 1.22% | 0.55 Mt Pb | 31 Dec 2025 |
| Total Resources | 45.00 Mt | 1.22% | 0.55 Mt Pb | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Zn | Pb | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | |||||
| Inferred | 45.00 Mt | 7.21% | 3.24 Mt Zn | 1.22% | 0.55 Mt Pb | 31 Dec 2025 | p.28 - ZINC: Other zinc assetsManual entry | |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (4)Source: Glencore plc - Resources and Reserves Report 2025 (dedicated annual R&R statement, as at 31 Dec 2025; minedocs mirror of the glencore.com original) · published 29 Jan 2026 Ref: p.28 - ZINC: Other zinc assets
QA notes:
|
| Total Resources | 45.00 Mt | 7.21% | 3.24 Mt Zn | 1.22% | 0.55 Mt Pb | 31 Dec 2025 | derived from 1 row
| — |