Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Fe) | Contained (Mt Fe) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 2.77 Mt | 33.62% | 0.93 Mt Fe | 16 June 2025 |
| Inferred | 5.08 Mt | 30.39% | 1.55 Mt Fe | 16 June 2025 |
| Total Resources | 7.85 Mt | 31.53% | 2.48 Mt Fe | 16 June 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Fe | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Fe) | Contained (Mt Fe) | |||||
| Indicated | 2.77 Mt | 33.62% | 0.93 Mt Fe | 16 June 2025 | Rio Piracicaba Project – Iron Ore mineral resource summary tableUnverified | |
notes (3)Ref: Rio Piracicaba Project – Iron Ore mineral resource summary table
|
| Inferred | 5.08 Mt | 30.39% | 1.55 Mt Fe | 16 June 2025 | Rio Piracicaba Project – Iron Ore mineral resource summary tableUnverified | notes (3)Ref: Rio Piracicaba Project – Iron Ore mineral resource summary table
|
| Total Resources | 7.85 Mt | 31.53% | 2.48 Mt Fe | 16 June 2025 | derived from 2 rows | — |