Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Fe) | Contained (Mt Fe) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 2.65 Mt | 33.74% | 0.89 Mt Fe | 30 Mar 2022 |
| Inferred | 5.21 Mt | 30.40% | 1.58 Mt Fe | 30 Mar 2022 |
| Total Resources | 7.85 Mt | 31.53% | 2.48 Mt Fe | 30 Mar 2022 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Fe | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Fe) | Contained (Mt Fe) | |||||
| Indicated | 2.65 Mt | 33.74% | 0.89 Mt Fe | 30 Mar 2022 | Iron - Rio Piracicaba Project mineral resource summary tableUnverified | |
notes (5)Ref: Iron - Rio Piracicaba Project mineral resource summary table
QA notes:
|
| Inferred | 5.21 Mt | 30.40% | 1.58 Mt Fe | 30 Mar 2022 | Iron - Rio Piracicaba Project mineral resource summary tableUnverified | notes (5)Ref: Iron - Rio Piracicaba Project mineral resource summary table
QA notes:
|
| Total Resources | 7.85 Mt | 31.53% | 2.48 Mt Fe | 30 Mar 2022 | derived from 2 rows | — |
Figures are on a 100% project basis unless a row carries the attrib chip; Atlas Lithium Corp holds 45.1% of this project.