Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | 4.31 Mt | 1.13% Li2O | 0.12 Mt LCE | 30 June 2025 |
| Indicated | 5.43 Mt | 0.95% Li2O | 0.13 Mt LCE | 30 June 2025 |
| Inferred | 3.14 Mt | 0.90% Li2O | 0.07 Mt LCE | 30 June 2025 |
| Total Resources | 12.88 Mt | 1.00% Li2O | 0.32 Mt LCE | 30 June 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | |||||
| Measured | 4.31 Mt | 1.13% Li2O | 0.12 Mt LCE | 30 June 2025 | Mineral Resources — Wolfsberg Project resource tableUnverified | |
notes (3)Ref: Mineral Resources — Wolfsberg Project resource table
QA notes:
|
| Indicated | 5.43 Mt | 0.95% Li2O | 0.13 Mt LCE | 30 June 2025 | Mineral Resources — Wolfsberg Project resource tableUnverified | notes (3)Ref: Mineral Resources — Wolfsberg Project resource table
QA notes:
|
| Inferred | 3.14 Mt | 0.90% Li2O | 0.07 Mt LCE | 30 June 2025 | Mineral Resources — Wolfsberg Project resource tableUnverified | notes (3)Ref: Mineral Resources — Wolfsberg Project resource table
QA notes:
|
| Total Resources | 12.88 Mt | 1.00% Li2O | 0.32 Mt LCE | 30 June 2025 | derived from 3 rows | — |